Osisko Drilling Returns High-Grade at Windfall



96.7 g/t Au Over 2.2 Metres in Triple Lynx




97.4 g/t Au Over 2.0 Metres in Underdog

TORONTO, July 20, 2021 (GLOBE NEWSWIRE) — Osisko Mining Inc. (OSK:TSX. “Osisko” or the “Corporation”) is pleased to provide new analytical results from the ongoing drill program at its 100% owned Windfall gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec.

Significant new analytical results presented below include 96 intercepts in 25 drill holes (7 from surface, 18 from underground) and 20 wedges. The infill intercepts are located inside defined February 2021 mineral resource estimate (“MRE”) blocks (

see Osisko news release dated February 17,


2021

). The expansion intercepts are located outside the February 2021 MRE blocks and either expand resource wireframes or are in a defined zone or corridor but do not yet correlate to a specific wireframe.

Osisko Chief Executive Officer John Burzynski commented: “The drill program at Windfall continues to deliver positive results. Both headline holes are infill holes from two different zones. Further, the first two intervals in hole OSK-W-21-2123-W5 extended Lynx 4 wireframe-3170 25 meters to depth and the third interval is in an adjacent area currently being modelled. Expansion drilling in the Triple Lynx corridor following up on hole OSK-W-20-2371-W1 which intersected

123 g/t Au over 2.4 meters

(

see Osisko news release dated April 8, 2021

) successfully intercepted this new zone with the last interval in hole OSK-W-21-2275-W7. All these results will be included in the resource estimate update by the end of the year”.

Selected high-grade intercepts include:

96.7 g/t Au over 2.2 metres

and

29.3 g/t Au over 5.2 metres

in WST-21-0824;

49.9 g/t Au over 4.0 metres

in OSK-W-21-2503-W1;

97.4 g/t Au over 2.0 metres

in OSK-W-21-2512-W1;

69.9 g/t Au over 2.4 metres

in OSK-W-21-2522;

67.0 g/t Au over 2.1 metres

in WST-21-0791;

28.7 g/t Au over 4.1 metres

in WST-21-0797A;

51.9 g/t Au over 2.2 metres

in OSK-W-21-2512. Maps showing hole locations and full analytical results are available at


www.osiskomining.com



.



Infill Drilling


Hole No.

From (m)

To (m)

Interval (m)

Au (g/t) uncut

Au (g/t) cut to 100 g/t

Zone

Corridor

OSK-W-21-1827-W5

520.7

523.0

2.3

6.06


Caribou_2241


Caribou


including
520.7 521.7 1.0 13.4

OSK-W-21-1882-W4

452.0

454.0

2.0

4.47


Caribou_2232


Caribou


including
453.4 454.0 0.6 14.1

790.9

793.0

2.1

6.17


UDD_4100


Underdog


including
791.2 791.5 0.3 32.4

OSK-W-21-2067-W9

1048.0

1050.0

2.0

10.1


TLX_3183

Triple Lynx

1069.0

1071.0

2.0

6.57


TLX_3163

Triple Lynx

1107.6

1111.5

3.9

5.52


TLX_3162


Triple Lynx


including
1110.7 1111.1 0.4 11.9

1114.3

1116.9

2.6

6.47


TLX_3170


Triple Lynx


including
1115.1 1115.6 0.5 16.0

1122.0

1124.0

2.0

12.3


TLX_3170


Triple Lynx


including
1123.0 1123.5 0.5 26.1

1126.3

1133.0

6.7

9.09


TLX_3170


Triple Lynx


including
1126.6 1127.0 0.4 28.0

and
1129.0 1130.0 1.0 24.7

OSK-W-21-2275-W7

793.0

795.2

2.2

13.2


TLX_3171


Triple Lynx


including
794.2 794.5 0.3 37.1

OSK-W-21-2363-W5

700.0

702.0

2.0

3.67


TLX_3177


Triple Lynx


including
700.6 701.4 0.8 9.11

760.0

762.0

2.0

5.15


TLX_3171


Triple Lynx


including
760.5 761.0 0.5 19.7

OSK-W-21-2478-W5

880.8

883.5

2.7

6.94


TLX_3184


Triple Lynx


including
880.8 881.1 0.3 38.8

984.0

986.0

2.0

11.3


TLX_3193


Triple Lynx


including
985.0 985.3 0.3 71.4

OSK-W-21-2479-W5

956.2

958.5

2.3

14.2


UDD_4910


Underdog


including
956.2 956.5 0.3 38.4

964.1

966.3

2.2

5.69


UDD_4514


Underdog


including
965.7 966.3 0.6 20.2

OSK-W-21-2492-W4

886.0

888.0

2.0

4.55


LX4_3417

Lynx 4

OSK-W-21-2495-W1

652.2

654.5

2.3

4.20


LXM_3304


Lynx


including
652.2 652.7 0.5 12.3

OSK-W-21-2503-W1

978.0

982.0

4.0

49.9

45.2

TLX_3163


Triple Lynx


including
978.4 979.1 0.7 127 100

1002.9

1005.0

2.1

5.90


TLX_3164


Triple Lynx


including
1004.6 1005.0 0.4 26.8

OSK-W-21-2503-W2

995.0

997.0

2.0

5.99


TLX_3163

Triple Lynx

1025.8

1028.0

2.2

9.54


TLX_3164

Triple Lynx

1080.0

1082.0

2.0

37.1

18.1

TLX_3162


Triple Lynx


including
1080.7 1081.0 0.3 227 100

1084.4

1088.0

3.6

5.14


TLX_3162


Triple Lynx


including
1084.4 1084.8 0.4 22.5

OSK-W-21-2512

735.8

738.0

2.2

51.9

26.4

UDD_4104


Underdog


including
736.2 736.7 0.5 212 100

OSK-W-21-2512-W1

765.0

767.0

2.0

97.4

50.1

UDD_4104


Underdog


including
766.0 767.0 1.0 195 100

992.8

994.8

2.0

12.2


UDD_4910


Underdog


including
993.9 994.8 0.9 25.7

OSK-W-21-2520

878.0

880.0

2.0

4.05


UDD_4100


Underdog


including
878.9 879.4 0.5 15.3

OSK-W-21-2522

1003.5

1005.9

2.4

69.9

39.8

LX4_3430


Lynx 4


including
1003.9 1004.6 0.7 203 100

OSK-W-21-2528

224.8

227.2

2.4

4.90


Caribou_2100

Caribou

OSK-W-21-2531

619.7

621.9

2.2

4.64


Caribou_2233


Caribou


including
621.5 621.9 0.4 22.1

OSK-W-21-2532

512.0

514.0

2.0

10.6


Caribou_2241


Caribou


including
512.0 512.4 0.4 40.5

WST-21-0759

127.9

130.0

2.1

10.5


LXM_3334

Lynx

337.0

341.6

4.6

6.33


TLX_3167


Triple Lynx


including
340.7 341.2 0.5 13.5

588.0

590.1

2.1

25.6


LX4_3427

Lynx 4

663.5

665.5

2.0

34.9

25.7

LX4_3438


Lynx 4


including
665.0 665.5 0.5 137 100

WST-21-0770

529.4

531.4

2.0

7.80


LX4_3430

Lynx 4

WST-21-0791

97.9

101.6

3.7

4.57


LXM_3313

Lynx

163.0

165.0

2.0

13.3


LXM_3304


Lynx


including
163.0 163.9 0.9 29.2

167.5

169.8

2.3

14.8


LXM_3304


Lynx


including
169.3 169.8 0.5 42.0

298.8

301.2

2.4

4.80


LHW_3215


Lynx HW


including
299.6 300.3 0.7 16.0

WST-21-0792

169.5

172.0

2.5

5.69


LXM_3304


Lynx


including
169.5 170.3 0.8 11.8

296.1

298.3

2.2

23.2


LHW_3215


Lynx HW


including
296.1 297.1 1.0 48.8

WST-21-0793A

167.0

169.0

2.0

7.65


LXM_3304


Lynx


including
167.3 167.7 0.4 28.5

240.6

242.6

2.0

4.99


LHW_3221


Lynx HW


including
241.5 242.3 0.8 11.4

WST-21-0794

282.0

284.0

2.0

6.73


LHW_3215

Lynx HW

290.0

292.0

2.0

4.11


LHW_3215


Lynx HW


including
291.3 291.7 0.4 19.9

WST-21-0797A

125.6

127.6

2.0

45.5

23.9

LXM_3334


Lynx


including
126.3 126.7 0.4 208 100

335.3

341.4

6.1

15.5


TLX_3131


Triple Lynx


including
339.3 340.3 1.0 35.5

350.6

354.7

4.1

28.7

25.2

TLX_3167


Triple Lynx


including
353.8 354.2 0.4 136 100

357.0

359.0

2.0

4.51


TLX_3167

Triple Lynx

WST-21-0801

287.3

289.9

2.6

21.3


Lynx SW

Lynx SW

WST-21-0807

325.4

327.8

2.4

3.74


TLX_3167

Triple Lynx

480.8

483.0

2.2

25.1


LX4_3450


Lynx 4


including
481.8 482.5 0.7 72.1

WST-21-0816

69.0

71.4

2.4

4.88


Z27_1115

Zone 27

WST-21-0818

67.7

69.9

2.2

5.79


Z27_1115

Zone 27

WST-21-0822

62.4

64.4

2.0

6.39


Z27_1102

Zone 27

117.6

119.8

2.2

16.2

14.2

Z27


Zone 27


including
118.5 118.8 0.3 114 100

WST-21-0824

261.6

263.8

2.2

96.7

27.1

TLX_3161


Triple Lynx


including
262.3 262.8 0.5 406 100

273.8

279.0

5.2

29.3


TLX_3161


Triple Lynx


including
275.0 276.0 1.0 89.0

283.5

285.5

2.0

3.59


TLX_3161

Triple Lynx

WST-21-0829

149.0

152.1

3.1

5.66


LXM_3334

Lynx

WST-21-0838

344.0

346.0

2.0

4.30


LSW_3556

Lynx SW

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See

“Quality Control and Reporting Protocols”

below. Z27 = Zone 27, LSW = Lynx Southwest, LXM = Lynx Main, LX4 = Lynx 4, LHW = Lynx Hanging Wall, TLX = Triple Lynx and UDD = Underdog.



Expansion Drilling


Hole No.

From (m)

To (m)

Interval (m)

Au (g/t) uncut

Au (g/t) cut to 100 g/t

Zone

Corridor

OSK-W-21-1432-W3

950.0

952.5

2.5

37.5

32.7

Lynx 4


Lynx


including
951.0 951.5 0.5 124 100

OSK-W-21-1827-W4

1024.3

1026.5

2.2

4.14


Underdog


Underdog


including
1024.3 1024.6 0.3 20.0

OSK-W-21-2067-W8

996.0

999.0

3.0

4.34


Triple Lynx

Triple Lynx

OSK-W-21-2123-W5

1220.0

1222.0

2.0

5.99


Triple Lynx


Triple Lynx


including
1220.0 1220.5 0.5 20.2

1233.0

1235.0

2.0

4.61


Triple Lynx

Triple Lynx

1293.3

1295.7

2.4

9.77


Triple Lynx


Triple Lynx


including
1294.7 1295.7 1.0 19.8

OSK-W-21-2123-W6

1091.0

1093.0

2.0

6.76


Triple Lynx

Triple Lynx

1144.0

1146.0

2.0

3.78


Triple Lynx

Triple Lynx

1176.0

1178.0

2.0

6.57


Triple Lynx


Triple Lynx


including
1177.3 1177.6 0.3 43.2

OSK-W-21-2275-W7

766.9

769.0

2.1

3.55


Triple Lynx


Triple Lynx


including
766.9 767.2 0.3 24.5

782.5

785.0

2.5

5.95


Triple Lynx


Triple Lynx


including
783.1 783.6 0.5 14.1

and
784.5 785.0 0.5 14.6

862.0

864.0

2.0

5.04


Triple Lynx


Triple Lynx


including
862.5 862.9 0.4 13.4

and
863.7 864.0 0.3 12.6

1113.4

1115.6

2.2

9.82


Triple Lynx

Triple Lynx

OSK-W-21-2287-W2

1259.0

1261.0

2.0

4.68


Lynx 4

Lynx

OSK-W-21-2470-W5

1166.0

1168.2

2.2

7.34


Triple Lynx


Triple Lynx


including
1166.5 1167.6 1.1 14.6

OSK-W-21-2479-W5

475.0

477.0

2.0

3.79


Z27

Zone 27

842.0

844.0

2.0

8.61


Underdog


Underdog


including
842.5 843.3 0.8 21.4

OSK-W-21-2503-W2

981.0

983.1

2.1

4.27


Triple Lynx

Triple Lynx

1040.0

1042.0

2.0

3.83


Triple Lynx

Triple Lynx

OSK-W-21-2512-W1

1009.0

1011.0

2.0

43.0

24.6

Underdog


Underdog


including
1009.6 1010.0 0.4 192 100

OSK-W-21-2522-W1

849.0

851.0

2.0

3.76


Lynx

Lynx

OSK-W-21-2528

283.0

285.0

2.0

4.97


Caribou


Caribou


including
284.3 285.0 0.7 13.4

526.0

528.0

2.0

3.85


Z27

Zone 27

OSK-W-21-2533

252.0

254.0

2.0

5.39


F51

F51

WST-21-0682B

400.0

403.8

3.8

11.9


Lynx SW

Lynx SW

WST-21-0724

264.6

266.7

2.1

3.98


Triple Lynx


Triple Lynx


including
266.2 266.7 0.5 16.6

WST-21-0726

431.5

433.7

2.2

3.97


Triple Lynx


Triple Lynx


including
432.3 432.7 0.4 19.3

WST-21-0770

545.4

547.5

2.1

6.94


Lynx 4


Lynx


including
546.4 546.9 0.5 18.5

WST-21-0791

237.9

240.0

2.1

67.0

23.9

Lynx HW


Lynx


including
237.9 238.4 0.5 281 100

WST-21-0793A

235.5

237.6

2.1

3.71


Lynx HW


Lynx


including
236.4 237.3 0.9 7.71

WST-21-0797A

182.9

185.5

2.6

4.04


Lynx

Lynx

380.2

382.4

2.2

35.9

24.2

Triple Lynx


Triple Lynx


including
382.1 382.4 0.3 186 100

WST-21-0829

359.6

363.0

3.4

6.81


Triple Lynx


Triple Lynx


including
362.0 363.0 1.0 15.5

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See

“Quality Control and Reporting Protocols”

below. SW = Southwest, HW = Hanging Wall, Z27 = Zone 27.



Drill hole location


Hole Number

Azimuth (°)

Dip (°)

Length (m)

UTM E

UTM N

Elevation

Section

OSK-W-21-1432-W3
132 -55 1094 453811 5435779 400 4300

OSK-W-21-1827-W4
331 -58 1046 452506 5434390 403 2475

OSK-W-21-1827-W5
331 -58 1164 452506 5434390 403 2475

OSK-W-21-1882-W4
328 -58 1074 452469 5434405 400 2450

OSK-W-21-2067-W8
123 -53 1191 453241 5435697 416 3750

OSK-W-21-2067-W9
123 -53 1164 453241 5435697 416 3750

OSK-W-21-2123-W5
126 -57 1332 453235 5435774 409 3800

OSK-W-21-2123-W6
126 -57 1346 453235 5435774 409 3800

OSK-W-21-2275-W7
127 -49 1182 452888 5435583 409 3400

OSK-W-21-2287-W2
116 -53 1392 453607 5435714 404 4075

OSK-W-21-2363-W5
139 -52 1014 452930 5435548 419 3425

OSK-W-21-2470-W5
132 -59 1203 453304 5435639 415 3775

OSK-W-21-2478-W5
128 -54 1166 452997 5435607 425 3500

OSK-W-21-2479-W5
344 -55 978 452315 5434419 399 2325

OSK-W-21-2492-W4
122 -53 945 453687 5435676 401 4125

OSK-W-21-2495-W1
123 -54 1301 453426 5435565 410 3850

OSK-W-21-2503-W1
126 -58 1161 453333 5435641 413 3800

OSK-W-21-2503-W2
126 -58 1199 453333 5435641 413 3800

OSK-W-21-2512
331 -54 1041 452448 5434465 400 2475

OSK-W-21-2512-W1
331 -54 1089 452448 5434465 400 2475

OSK-W-21-2520
337 -56 1140 452596 5434392 401 2550

OSK-W-21-2522
128 -54 1221 453451 5435594 411 3900

OSK-W-21-2522-W1
128 -54 1116 453451 5435594 411 3900

OSK-W-21-2528
333 -54 738 452469 5434682 403 2600

OSK-W-21-2531
344 -62 1188 452566 5434415 403 2550

OSK-W-21-2532
341 -60 1107 452480 5434428 401 2475

OSK-W-21-2533
159 -45 321 453476 5436035 405 4125

WST-21-0682B
129 -64 472 453106 5435066 231 3325

WST-21-0724
131 -64 295 453508 5435327 -7 3800

WST-21-0726
149 -64 454 453507 5435327 -7 3800

WST-21-0759
141 -43 680 453321 5435235 54 3600

WST-21-0770
129 -43 835 453374 5435296 -26 3675

WST-21-0791
129 -21 355 453463 5435327 32 3775

WST-21-0792
126 -20 346 453463 5435327 32 3775

WST-21-0793A
127 -16 322 453463 5435327 33 3775

WST-21-0794
121 -11 315 453463 5435327 33 3775

WST-21-0797A
138 -46 751 453321 5435235 54 3600

WST-21-0801
139 -54 418 452954 5435003 253 3175

WST-21-0807
144 -42 508 453321 5435235 54 3600

WST-21-0816
164 -4 109 451960 5434734 250 2175

WST-21-0818
167 1 106 451958 5434734 250 2175

WST-21-0822
129 29 124 451961 5434734 251 2175

WST-21-0824
156 -70 343 453506 5435327 -7 3800

WST-21-0829
131 -49 576 453258 5435209 96 3525

WST-21-0838
131 -56 366 453106 5435066 231 3325


Caribou Zone


Mineralization most commonly occurs in gold-bearing pyrite stockworks as well as semi-massive pyrite replacement zones associated with phyllic alteration (sericite-pyrite ± silica) with sulphides, pyrite dominated with minor chalcopyrite and sphalerite ranging from trace to up to 20%, and local visible gold. Mineralization is hosted in rhyolites or mafic-intermediate volcanics frequently at or near faults or the contact with felsic porphyritic intrusions.


Zone 27


Mineralization most commonly occurs as replacement-type characterized by 5% to 50% disseminated, stringer, semi-massive or stockwork pyrite, ptygmatic tourmaline veins, quartz-tourmaline crustiform veins, local quartz-carbonate veins, and local visible gold. Mineralization is associated with moderate to strong sericite, weak to strong silica, weak chlorite and carbonate and locally weak fuchsite and is hosted in strongly altered andesites, in or at the contact of the rhyolite, or along the contacts with felsic porphyritic intrusions.


Underdog


Mineralization most commonly occurs in gold-bearing quartz-pyrite (± tourmaline) veins and as disseminated, stringer, semi-massive to massive pyrite with minor sphalerite, chalcopyrite and molybdenite associated with strong sericite and silica alteration. Mineralization is hosted along the intrusive contacts of a three-phase composite felsic porphyritic unit which cross-cuts felsic and mafic volcanic sequences.


Lynx Zone


Mineralization occurs as grey to translucent quartz-carbonate-pyrite-tourmaline veins and pyrite replacement zones and stockworks. Vein-type mineralization is associated with haloes of pervasive sericite-pyrite ± silica alteration and contain sulphides (predominantly pyrite with minor amounts of chalcopyrite, sphalerite, galena, arsenopyrite, and pyrrhotite) and local visible gold. Replacement mineralization is associated with strong pervasive silica-sericite-ankerite ± tourmaline alteration and contains disseminated pyrite from trace to 80% with local visible gold. Pyrite stockworks can form envelopes that reach several tens of metres thick. Fuchsite alteration is common and is spatially constrained to near the gabbros. Mineralization occurs at or near geological contacts between felsic porphyritic or fragmental intrusions and the host rhyolites or gabbros and locally can be hosted along the gabbro-rhyolite contact.


Qualified Person



The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Director of Exploration for Osisko’s Windfall gold project, who is a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).


Quality Control and Reporting Protocols



True


width


determination


is


estimated


at


55-80%


of


the


reported


core


length


interval


for


the


zone.


Assays


are


uncut


except


where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.5 g/t Au diluted over core lengths of at least 2.0 metres. NQ core assays were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at (i) ALS Laboratories in Val d’Or, Québec, Vancouver, British Colombia, Lima, Peru or Vientiane, Laos (ii) Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using a Four Acid Digestion-ICP-MS method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control (“QA/QC”) and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.


About the Windfall Gold Deposit



The Windfall gold deposit is located between Val-d’Or and Chibougamau in the Abitibi region of Québec, Canada. The Mineral Resource Estimate (





MRE





) defined by Osisko, as disclosed in the news release dated February 17, 2021 is


supported by the technical report entitled “Preliminary Economic Assessment Update for the Windfall Project” dated April 26, 2021 (that includes Windfall Mineral Resource Estimate with an effective date  of November 30, 2020), and


assuming a cut-off grade of 3.50 g/t Au,


comprises 521,000 tonnes at 11.3 g/t Au (189,000 ounces) in the measured mineral resource category, 5,502,000 tonnes at 9.4 g/t Au (1,668,000 ounces) in the indicated mineral resource category and 16,401,000 tonnes at 8.0 g/t Au (4,244,000 ounces) in the inferred mineral resource category


. The key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in the February 17, 2021 news release are further described in the full technical report prepared by BBA Inc. in accordance with NI 43-101 and is available on SEDAR (



www.sedar.com



) under the Corporation’s issuer profile. The Windfall gold deposit is currently one of the highest-grade resource-stage gold projects in Canada and has world-class scale. Mineralization occurs


in


three


principal


zones:


Lynx,


Main Zone,


and


Underdog.


Mineralization is generally


comprised of


sub-vertical


zones


following


intrusive porphyry


contacts


plunging


to


the


northeast.


The r


esources are defined from


surface


to


a


depth


of


1,600


metres as it now includes the Triple 8 (T8) zone. The resources excluding T8 are defined from surface to a depth of 1,200 metres.


T


he deposit


remains


open along


strike


and


at


depth


.


Mineralization


has


been


identified


at


surface


in


some


areas


and


as


deep


as


2,625


metres in others with significant potential to extend mineralization down-plunge and at


depth.


About Osisko Mining Inc.



Osisko is a mineral exploration company focused on the acquisition, exploration, and development of gold resource properties in Canada. Osisko holds a 100% interest in the high-grade Windfall gold deposit located between Val-d’Or and Chibougamau


in


Québec


and


holds


a


100%


undivided


interest


in


a


large


area


of


claims


in


the


surrounding


Urban


Barry


area and nearby Quévillon area (over 2,700 square


kilometres).


Cautionary Note Regarding Forward-Looking Information



This news release contains “forward-looking information” within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as “expects”, or “does not expect”, “is expected”, “interpreted”, “management’s view”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “potential”, “feasibility”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains the forward-looking information pertaining to, among other things: the Windfall gold deposit being one of the highest-grade resource-stage gold projects in Canada and having world-class scale; the key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in this news release; the prospects, if any, of the Windfall gold deposit; timing and ability of Osisko to file a technical report for the mineral resource estimate disclosed in this news release; the timing and ability of Osisko, if at all, to publish a feasibility study for the Windfall gold deposit; the amount and type of drilling to be completed and the timing to complete such drilling; the focus of the remaining infill drilling; the trend of grade increase; the Lynx zone remaining open to expansion down plunge; upgrading a inferred mineral resource to a measured mineral resource or indicated mineral resource category; future drilling at the Windfall gold deposit; the significance of historic exploration activities and results. Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management’s geological modelling; the ability of Osisko to complete further exploration activities, including (infill) drilling; property and royalty interests in the Windfall gold deposit; the ability of the Corporation to obtain required approvals; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.


CONTACT INFORMATION:


John Burzynski

Chief Executive Officer

Telephone (416) 363-8653



Primary Logo