Osisko Drilling Returns 2181 g/t Au over 2.5 Metres in Lynx

293 g/t Au Over 4.0 Metres in Zone 27

TORONTO, Aug. 03, 2021 (GLOBE NEWSWIRE) — Osisko Mining Inc. (OSK:TSX. “Osisko” or the “Corporation”) is pleased to provide new analytical results from the ongoing drill program at its 100% owned Windfall gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec.

Significant new analytical results presented below include 73 intercepts in 22 drill holes (6 from surface, 16 from underground) and 16 wedges. The infill intercepts are located inside defined February 2021 mineral resource estimate (“MRE”) blocks (

see Osisko news release dated February 17,


2021

). The expansion intercepts are located outside the February 2021 MRE blocks and either expand resource wireframes or are in a defined zone or corridor but do not yet correlate to a specific wireframe.

Osisko Chief Executive Officer John Burzynski commented: “Windfall once again delivers outstanding results across the deposit. Six of our top results this week are greater than 200 g/t Au over 2.0 metres and three of these intervals have sub-intervals between two to six kilograms of gold per ton. These six holes are infill holes, once again confirming the high-grade nature of the deposit. Expansion drilling is also delivering; OSK-W-21-1949-W6 is 80 metres from the nearest resource block in the Lynx 4 corridor”.

Selected high-grade intercepts include:

2181 g/t Au over 2.5 metres

and

403 g/t Au over 2.2 metres

in OSK-W-21-2287-W1;

293 g/t Au over 4.4 metres

in WST-21-0814;

350 g/t Au over 2.1 metres

in OSK-W-21-2470-W6;

209 g/t Au over 2.9 metres

in OSK-W-21-1432-W4;

218 g/t Au over 2.0 metres

in OSK-W-21-2503-W2;

91.0 g/t Au over 3.8 metres

in OSK-W-21-1432-W3;

82.1 g/t Au over 3.2 metres

in WST-21-0811A;

89.0 g/t Au over 2.6 metres

in OSK-W-21-2509;

94.2 g/t Au over 2.1 metres

in OSK-W-21-2492-W5. Maps showing hole locations and full analytical results are available at


www.osiskomining.com


.



Infill Drilling


Hole No.

From

(m)

To

(m)

Interval

(m)

Au (g/t)

uncut

Au (g/t)

cut to

100 g/t

Zone

Corridor

OSK-W-21-1432-W3

1033.4

1037.2

3.8

91.0

41.3

LX4_3446


Lynx 4


including
1033.4 1034.3 0.9 304 100

OSK-W-21-1432-W4

866.0

868.9

2.9

209

65.9

LX4_3424


Lynx 4


including
867.0 867.9 0.9 480 100

OSK-W-21-1827-W3

946.0

948.4

2.4

5.84


UDD_4515


Underdog


including
947.4 947.9 0.5 27.2

OSK-W-21-1949-W5

643.2

648.0

4.8

8.18

LXM_3304


Lynx


including
645.3 645.9 0.6 25.5

1095.0

1097.2

2.2

7.28


LX4_3430

Lynx 4

OSK-W-21-2067-W9

1136.0

1138.3

2.3

36.4

23.7

TLX_3172


Triple Lynx


including
1137.5 1137.8 0.3 198 100

OSK-W-21-2287-W1

1209.9

1212.4

2.5

2181

57.4

LX4_3449


Lynx 4


including
1210.4 1211.3 0.9 5950 100

1215.0

1217.2

2.2

403

99.3

LX4_3449


Lynx 4


including
1216.1 1217.2 1.1 708 100

OSK-W-21-2287-W2

1149.7

1152.1

2.4

6.15


LX4_3455


Lynx 4


including
1151.3 1152.1 0.8 16.4

1245.0

1248.4

3.4

4.54


LX4_3449

Lynx 4

1262.4

1264.7

2.3

40.9

30.4

LX4_3445


Lynx 4


including
1264.1 1264.7 0.6 140 100

1278.6

1280.7

2.1

57.0

34.1

LX4_3445


Lynx 4


including
1279.0 1279.7 0.7 169 100

OSK-W-21-2470-W6

812.5

814.7

2.2

4.27


TLX_3173

Triple Lynx

958.0

960.1

2.1

350

36.0

TLX_3163


Triple Lynx


including
959.8 960.1 0.3 2300 100

967.0

969.5

2.5

10.1


TLX_3163

Triple Lynx

1037.0

1039.0

2.0

5.73


TLX_3162

Triple Lynx

1044.0

1046.2

2.2

10.3


TLX_3170


Triple Lynx


including
1045.6 1045.9 0.3 50.1

1081.0

1083.0

2.0

5.45

TLX_3172


Triple Lynx


including
1082.3 1082.6 0.3 23.1

OSK-W-21-2492-W5

788.7

790.8

2.1

94.2

55.2

LX4_3424


Lynx 4


including
789.5 789.9 0.4 239 100

OSK-W-21-2503-W2

1121.0

1123.0

2.0

218

37.3

TLX_3172


Triple Lynx


including
1121.7 1122.4 0.7 617 100

OSK-W-21-2528-W1

625.2

627.3

2.1

4.35


UDD_4914

Underdog

OSK-W-21-2531

1086.5

1092.0

5.5

3.57


UDD_4501

Underdog

OSK-W-21-2532

764.0

767.7

3.7

7.35


UDD_4116


Underdog


including
767.0 767.7 0.7 19.9

997.0

999.0

2.0

5.04


UDD_4501

Underdog

1023.0

1027.0

4.0

9.34


UDD_4502


Underdog


including
1024.1 1024.5 0.4 48.6

1032.0

1034.0

2.0

4.05


UDD_4513


Underdog


including
1032.9 1033.3 0.4 17.0

OSK-W-21-2534

984.0

986.1

2.1

7.81


UDD_4106


Underdog


including
985.2 985.5 0.3 49.8

1018.4

1020.4

2.0

16.1


UDD_4515


Underdog


including
1019.8 1020.1 0.3 75.7

OSK-W-21-2537

583.9

585.9

2.0

3.96


TLX_3178

Triple Lynx

OSK-W-21-2541

196.0

198.0

2.0

11.5


F51_6010


F-51


including
196.9 197.5 0.6 37.9

210.0

212.5

2.5

7.42


F51_6008

F-51

WST-21-0679

314.7

317.0

2.3

4.79


TLX_3131

Triple Lynx

WST-21-0726

235.7

237.8

2.1

32.9


TLX_3161

Triple Lynx

WST-21-0763A

503.0

505.0

2.0

5.08


LX4_3434

Lynx 4

including
507.0 509.0 2.0 3.73
LX4_3434

Lynx 4

WST-21-0794

266.3

268.3

2.0

22.7


LHW_3201


Lynx HW


including
267.2 267.8 0.6 68.7

WST-21-0797A

486.0

489.9

3.9

4.92


LX4_3450

Lynx 4

694.0

696.4

2.4

24.1


LX4


Lynx 4


including
694.6 695.0 0.4 96.8

716.9

720.6

3.7

6.16


LX4_3415

Lynx 4

724.0

726.0

2.0

39.5

32.1

LX4_3415


Lynx 4


including
725.7 726.0 0.3 149 100

WST-21-0811A

209.0

211.0

2.0

73.4

55.0

TLX_3161


Triple Lynx


including
210.0 210.5 0.5 158 100

310.0

313.2

3.2

82.1

34.2

TLX_3182


Triple Lynx


including
312.5 313.2 0.7 304 100

WST-21-0814

83.1

87.5

4.4

293

17.1

Z27_1102


Zone 27


including
83.1 83.5 0.4 3140 100

WST-21-0814A

67.3

69.7

2.4

27.2

22.4

Z27_1115


Zone 27


including
68.1 68.6 0.5 123 100

75.1

77.5

2.4

8.13


Z27_1102


Zone 27


including
76.3 76.6 0.3 46.4

WST-21-0817

74.0

76.0

2.0

4.64


Z27_1115

Zone 27

WST-21-0823

451.7

454.0

2.3

4.57


LX4_3430

Lynx 4

WST-21-0829

556.0

558.0

2.0

28.0


LX4_3450


Lynx 4


including
556.4 557.0 0.6 92.5

WST-21-0838

267.0

269.0

2.0

13.0


LSW_3506


Lynx SW


including
267.5 268.0 0.5 50.8

WST-21-0841

349.9

352.0

2.1

19.1


TLX_3166


Triple Lynx


including
350.5 351.5 1.0 39.6

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See

“Quality Control and Reporting Protocols”

below. Z27 = Zone 27, LXM = Lynx Main, LX4 = Lynx 4, LHW = Lynx Hanging Wall, TLX = Triple Lynx and UDD = Underdog.



Expansion Drilling


Hole No.

From

(m)

To

(m)

Interval

(m)

Au (g/t)

uncut

Au (g/t)

cut to

100 g/t

Zone

Corridor

OSK-W-21-777-W2

627.6

629.6

2.0

9.53


Caribou

Caribou

including
628.0 628.8 0.8 21.4

OSK-W-21-1432-W4

907.8

910.0

2.2

16.4


LX4


Lynx 4


including
908.6 909.0 0.4 59.1

915.1

917.8

2.7

23.0

LX4


Lynx 4


including
916.2 917.0 0.8 60.9

OSK-W-21-1827-W4

548.0

550.1

2.1

7.94

Caribou


Caribou


including
549.3 550.1 0.8 20.6

OSK-W-21-1949-W6

1175.0

1177.0

2.0

13.2

LX4


Lynx 4


including
1175.5 1176.0 0.5 30.1

OSK-W-21-2470-W6

927.0

929.2

2.2

4.18

TLX

Triple Lynx

OSK-W-21-2478-W6

857.7

860.1

2.4

17.0

TLX_3171


Triple Lynx


including
859.4 860.1 0.7 54.8

OSK-W-21-2479-W5

754.5

757.4

2.9

35.7

23.0

Underdog


Underdog


including
754.5 755.1 0.6 162 100

OSK-W-21-2503-W2

1142.5

1144.6

2.1

85.7

15.4

TLX


Triple Lynx


including
1144.0 1144.3 0.3 592 100

OSK-W-21-2509

619.1

621.7

2.6

89.0

44.3

Triple Lynx


Triple Lynx


including
620.3 621.0 0.7 266 100

OSK-W-21-2531

1035.0

1037.0

2.0

4.11


Underdog


Underdog


including
1035.7 1036.1 0.4 17.2

1173.0

1176.6

3.6

5.85


UDD


Underdog


including
1173.0 1174.0 1.0 15.9

OSK-W-21-2532

935.0

937.5

2.5

8.95


Underdog


Underdog


including
936.5 936.9 0.4 41.6

1012.8

1015.0

2.2

25.3


UDD


Underdog


including
1012.8 1013.3 0.5 97.6

OSK-W-21-2534

887.4

889.6

2.2

3.90


Underdog

Underdog

WST-21-0726

337.3

339.4

2.1

24.4

17.6

TLX


Triple Lynx


including
338.3 338.6 0.3 148 100

348.7

351.0

2.3

17.7


TLX_3131


Triple Lynx


including
349.1 349.9 0.8 49.9

WST-21-0776

229.6

231.6

2.0

10.0


Triple Lynx


Triple Lynx


including
230.9 231.6 0.7 28.2

WST-21-0811A

471.8

474.5

2.7

3.60


LX4

Lynx 4

WST-21-0823

445.0

447.0

2.0

5.10


LX4

Lynx 4

WST-21-0826

347.9

350.0

2.1

13.8


TLX_3166


Triple Lynx


including
348.4 348.7 0.3 57.3

WST-21-0842

323.3

325.7

2.4

14.7

12.8

TLX


Triple Lynx


including
323.3 323.6 0.3 116 100

333.8

337.3

3.5

5.28


TLX


Triple Lynx


including
335.4 336.0 0.6 12.8

344.7

347.0

2.3

5.75


Triple Lynx


Triple Lynx


including
346.2 347.0 0.8 15.4

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See

“Quality Control and Reporting Protocols”

below. LX4 = Lynx 4, TLX = Triple Lynx, UDD = Underdog.



Drill hole location


Hole Number

Azimuth (°)

Dip (°)

Length (m)

UTM E

UTM N

Elevation

Section

OSK-W-21-777-W2
330 -59 1170 452678 5434500 403 2675

OSK-W-21-1432-W3
132 -55 1094 453811 5435779 400 4300

OSK-W-21-1432-W4
132 -55 1053 453811 5435779 400 4300

OSK-W-21-1827-W3
331 -58 1251 452506 5434390 403 2475

OSK-W-21-1827-W4
331 -58 1046 452506 5434390 403 2475

OSK-W-21-1949-W5
105 -57 1301 453440 5435479 401 3825

OSK-W-21-1949-W6
105 -57 1227 453440 5435479 401 3825

OSK-W-21-2067-W9
123 -53 1164 453241 5435697 416 3750

OSK-W-21-2287-W1
116 -53 1374 453607 5435714 404 4075

OSK-W-21-2287-W2
116 -53 1392 453607 5435714 404 4075

OSK-W-21-2470-W6
132 -59 1119 453304 5435639 415 3775

OSK-W-21-2478-W6
128 -54 948 452997 5435607 425 3500

OSK-W-21-2479-W5
344 -55 978 452315 5434419 399 2325

OSK-W-21-2492-W5
122 -53 888 453687 5435676 401 4125

OSK-W-21-2503-W2
126 -58 1199 453333 5435641 413 3800

OSK-W-21-2509
132 -56 663 452825 5435340 414 3225

OSK-W-21-2528-W1
333 -54 720 452469 5434682 403 2600

OSK-W-21-2531
344 -62 1188 452566 5434415 403 2550

OSK-W-21-2532
341 -60 1107 452480 5434428 401 2475

OSK-W-21-2534
343 -59 1203 452549 5434363 401 2500

OSK-W-21-2537
114 -54 1243 452981 5435549 420 3450

OSK-W-21-2541
149 -47 285 453541 5436007 405 4175

WST-21-0679
145 -46 441 453257 5435209 96 3525

WST-21-0726
149 -64 454 453507 5435327 -7 3800

WST-21-0763A
120 -39 567 453507 5435332 -47 3800

WST-21-0776
160 -44 376 453257 5435209 96 3525

WST-21-0794
121 -11 315 453463 5435327 33 3775

WST-21-0797A
138 -46 751 453321 5435235 54 3600

WST-21-0811A
125 -44 708 453375 5435296 -26 3675

WST-21-0814
154 -6 96 451960 5434734 249 2175

WST-21-0814A
154 5 97 451960 5434734 250 2175

WST-21-0817
169 -10 111 451958 5434734 249 2175

WST-21-0823
120 -35 545 453507 5435332 -47 3800

WST-21-0826
129 -59 403 453106 5435066 231 3325

WST-21-0829
131 -49 576 453258 5435209 96 3525

WST-21-0838
131 -56 366 453106 5435066 231 3325

WST-21-0841
125 -65 438 453106 5435066 231 3325

WST-21-0842
156 -69 445 453506 5435327 -7 3800


Caribou Zone


Mineralization most commonly occurs in gold-bearing pyrite stockworks as well as semi-massive pyrite replacement zones associated with phyllic alteration (sericite-pyrite ± silica) with sulphides, pyrite dominated with minor chalcopyrite and sphalerite ranging from trace to up to 20%, and local visible gold. Mineralization is hosted in rhyolites or mafic-intermediate volcanics frequently at or near faults or the contact with felsic porphyritic intrusions.


Zone 27


Mineralization most commonly occurs as replacement-type characterized by 5% to 50% disseminated, stringer, semi-massive or stockwork pyrite, ptygmatic tourmaline veins, quartz-tourmaline crustiform veins, local quartz-carbonate veins, and local visible gold. Mineralization is associated with moderate to strong sericite, weak to strong silica, weak chlorite and carbonate and locally weak fuchsite and is hosted in strongly altered andesites, in or at the contact of the rhyolite, or along the contacts with felsic porphyritic intrusions.


Underdog


Mineralization most commonly occurs in gold-bearing quartz-pyrite (± tourmaline) veins and as disseminated, stringer, semi-massive to massive pyrite with minor sphalerite, chalcopyrite and molybdenite associated with strong sericite and silica alteration. Mineralization is hosted along the intrusive contacts of a three-phase composite felsic porphyritic unit which cross-cuts felsic and mafic volcanic sequences.


Lynx Zone


Mineralization occurs as grey to translucent quartz-carbonate-pyrite-tourmaline veins and pyrite replacement zones and stockworks. Vein-type mineralization is associated with haloes of pervasive sericite-pyrite ± silica alteration and contain sulphides (predominantly pyrite with minor amounts of chalcopyrite, sphalerite, galena, arsenopyrite, and pyrrhotite) and local visible gold. Replacement mineralization is associated with strong pervasive silica-sericite-ankerite ± tourmaline alteration and contains disseminated pyrite from trace to 80% with local visible gold. Pyrite stockworks can form envelopes that reach several tens of metres thick. Fuchsite alteration is common and is spatially constrained to near the gabbros. Mineralization occurs at or near geological contacts between felsic porphyritic or fragmental intrusions and the host rhyolites or gabbros and locally can be hosted along the gabbro-rhyolite contact.


F-Zones


Mineralization is hosted in sheared andesites with carbonate replacement or quartz veining and occurs as quartz ± ankerite veinlets or as replacement type in shear zones and is characterised by trace to 10% pyrite with local visible gold. Alteration is dominated by sericite-fuchsite-tourmaline-pyrite.


Qualified Person



The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Director of Exploration for Osisko’s Windfall gold project, who is a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).


Quality Control and Reporting Protocols



True


width


determination


is


estimated


at


55-80%


of


the


reported


core


length


interval


for


the


zone.


Assays


are


uncut


except


where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.5 g/t Au diluted over core lengths of at least 2.0 metres. NQ core assays were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at (i) ALS Laboratories in Val d’Or, Québec, Vancouver, British Colombia, Lima, Peru or Vientiane, Laos (ii) Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using a Four Acid Digestion-ICP-MS method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control (“QA/QC”) and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.


About the Windfall Gold Deposit



The Windfall gold deposit is located between Val-d’Or and Chibougamau in the Abitibi region of Québec, Canada. The Mineral Resource Estimate (





MRE





) defined by Osisko, as disclosed in the news release dated February 17, 2021 is


supported by the technical report entitled “Preliminary Economic Assessment Update for the Windfall Project” dated April 26, 2021 (that includes Windfall Mineral Resource Estimate with an effective date  of November 30, 2020), and


assuming a cut-off grade of 3.50 g/t Au,


comprises 521,000 tonnes at 11.3 g/t Au (189,000 ounces) in the measured mineral resource category, 5,502,000 tonnes at 9.4 g/t Au (1,668,000 ounces) in the indicated mineral resource category and 16,401,000 tonnes at 8.0 g/t Au (4,244,000 ounces) in the inferred mineral resource category


. The key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in the February 17, 2021 news release are further described in the full technical report prepared by BBA Inc. in accordance with NI 43-101 and is available on SEDAR (



www.sedar.com



) under the Corporation’s issuer profile. The Windfall gold deposit is currently one of the highest-grade resource-stage gold projects in Canada and has world-class scale. Mineralization occurs


in


three


principal


zones:


Lynx,


Main Zone,


and


Underdog.


Mineralization is generally


comprised of


sub-vertical


zones


following


intrusive porphyry


contacts


plunging


to


the


northeast.


The r


esources are defined from


surface


to


a


depth


of


1,600


metres as it now includes the Triple 8 (T8) zone. The resources excluding T8 are defined from surface to a depth of 1,200 metres.


T


he deposit


remains


open along


strike


and


at


depth


.


Mineralization


has


been


identified


at


surface


in


some


areas


and


as


deep


as


2,625


metres in others with significant potential to extend mineralization down-plunge and at


depth.


About Osisko Mining Inc.



Osisko is a mineral exploration company focused on the acquisition, exploration, and development of gold resource properties in Canada. Osisko holds a 100% interest in the high-grade Windfall gold deposit located between Val-d’Or and Chibougamau


in


Québec


and


holds


a


100%


undivided


interest


in


a


large


area


of


claims


in


the


surrounding


Urban


Barry


area and nearby Quévillon area (over 2,700 square


kilometres).


Cautionary Note Regarding Forward-Looking Information



This news release contains “forward-looking information” within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as “expects”, or “does not expect”, “is expected”, “interpreted”, “management’s view”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “potential”, “feasibility”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains the forward-looking information pertaining to, among other things: the Windfall gold deposit being one of the highest-grade resource-stage gold projects in Canada and having world-class scale; the key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in this news release; the prospects, if any, of the Windfall gold deposit; timing and ability of Osisko to file a technical report for the mineral resource estimate disclosed in this news release; the timing and ability of Osisko, if at all, to publish a feasibility study for the Windfall gold deposit; the amount and type of drilling to be completed and the timing to complete such drilling; the focus of the remaining infill drilling; the trend of grade increase; the Lynx zone remaining open to expansion down plunge; upgrading a inferred mineral resource to a measured mineral resource or indicated mineral resource category; future drilling at the Windfall gold deposit; the significance of historic exploration activities and results. Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management’s geological modelling; the ability of Osisko to complete further exploration activities, including (infill) drilling; property and royalty interests in the Windfall gold deposit; the ability of the Corporation to obtain required approvals; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.


CONTACT INFORMATION:


John Burzynski

Chief Executive Officer

Telephone (416) 363-8653



Primary Logo