Great Panther Reports Second Quarter 2022 Production Results
PR Newswire
TSX:
GPR
| NYSE American:
GPL
This news release constitutes a “designated news release” for the purposes of the Company’s prospectus supplement dated
October 15, 2021
, to its short form base shelf prospectus dated
September 10, 2021
.
VANCOUVER, BC
,
July 21, 2022
/PRNewswire/ – Great Panther Mining Limited (TSX: GPR) (NYSE-A: GPL) (“Great Panther” or the “Company”), a growth-oriented precious metals producer focused on the Americas, reports production results for the three months ended
June 30, 2022
, from its two wholly-owned operating mines, Tucano in
Brazil
and
Topia
in
Mexico
.
Second Quarter 2022 Production Highlights
- Consolidated metal production of 20,187 gold equivalent ounces (“Au eq oz”), inclusive of 16,889 gold ounces (“Au oz”) and 159,529 silver ounces
- Total gold production at Tucano of 16,629 Au oz
-
Total silver equivalent production at
Topia
of 266,893 silver equivalent ounces (“Ag eq oz”)
“The second quarter was transformational for Great Panther with the announcement of the agreement to sell our Mexican assets,” stated
Alan Hair
, Chair and Interim CEO of Great Panther. “Divesting these assets allows us to channel our resources towards the Tucano Gold Mine where we believe the most value can be created for investors and other stakeholders. Production from Tucano during the quarter was in line with expectations as we position the mine for a return to steady-state production. Heavy stripping activity over the last number of quarters has prepared numerous pits for increased production of ore in the second half of the year, which we believe will result in improving production results in the quarters to come.”
Consolidated Operating Results
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Company’s operations are on track to meet previously announced consolidated production guidance for 2022 of 100,000 to 119,000 Au eq oz. The mine plan for Tucano reflects more stripping in the first half of 2022 with the second half of 2022 expected to account for at least 65% of annual gold production guidance. Annual consolidated production guidance is subject to the sale of the Mexican silver assets and will be revisited once the transaction is complete.
Tucano
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total mined tonnage increased by 76% compared to Q1 2022 and 36% compared to Q2 2021 due to having two mining contractors, U&M and MINAX, operating in parallel throughout different pits. Mined ore tonnage and gold grades during the second quarter were higher compared to the first quarter of 2022. This improvement is related to ore lenses in the different pits being already accessed as per mine sequence.
Production from Tucano during this second quarter was in line with expectations as stripping continued to advance in preparation for accessing main ore lenses and consequently better grades in the second half of 2022. Gold production in Q2 2022 was 16,629 oz compared with 14,037 Au oz in Q1 2022, an increase of 18%, and 20,696 Au oz in Q2 2021, a decrease of 20%.
Topia
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Silver equivalent production at
Topia
in Q2 2022 was 266,893 Ag eq oz compared with 312,259 Ag eq oz in Q2 2021, a decrease of 15%, and 290,694 Ag eq oz in Q1 2022, a decrease of 8%, primarily due to lower gold and silver grades. These factors were partly offset by higher gold recovery and the increase in production attributed to the change in metal equivalency ratios for zinc.
Guanajuato Mine Complex
The Guanajuato Mine Complex (“GMC”) is currently on care and maintenance. Consequently, there was no production at the GMC during Q2 2022.
On
June 29, 2022
, the Company announced that it has entered into a Share Purchase Agreement (the “Agreement”) to sell 100% of the Company’s Mexican subsidiary Minera Mexicana El Rosario S.A. de C.V. (“MMR”), which holds the GMC, the
Topia
mine, and the El Horcón and
Santa Rosa
projects, all located in
Mexico
. The sale of MMR is expected to close in the third quarter of 2022.
Tucano Exploration Update
During the quarter, the resource conversion drill program for the Urucum North underground project was completed and an updated resource estimate is currently being developed. In parallel, the Company has started trade-off studies for ramp development and mining methods in parallel with engineering and metallurgical project work while planning activities are underway. The permitting process has also started with the State Environmental Agency, SEMA. Project development including the update of mineral resources and reserves is on track to be completed by the fourth quarter of this year.
Regional target definition, validation and subsequent prioritization is currently underway in consultation with GoldSpot Discoveries Corp. (“GoldSpot”). This project commenced in June and results are expected in early August. Portable drills have been contracted and drilling is expected to begin in August upon completion of the GoldSpot study. The Company expects to drill between 2,500 to 3,500 metres as part of the regional program.
Second Quarter 2022 Financial Results
Great Panther has scheduled the release of its second quarter 2022 financial results for
Wednesday, August 3, 2022
, after market close. The Company will host a conference call and webcast to discuss the results on
Thursday, August 4, 2022
, at
9:00 AM PT
/
12:00 PM ET
.
Live webcast and registration:
https://www.greatpanther.com/investors/webcasts/
Conference call
Canada
and US Toll-Free: + 1 800 319 4610
International Toll: + 1 604 638 5340
A replay of the webcast will be available on the
Webcasts
section of Great Panther’s website approximately one hour after the conference call. Audio replay will be available until
September 4, 2022
.
Audio replay
Canada
and US Toll-Free: + 1 800 319 6413
International Toll: + 1 604 638 9010
Replay Access Code: 9181
Technical Disclosure
The technical information contained in this news release has been reviewed and approved by
Fernando A. Cornejo
, P. Eng., Chief Operating Officer, a non-independent Qualified Person for the purposes of National Instrument 43-101 –
Standards of Disclosure for Mineral Projects
.
ABOUT GREAT PANTHER
Great Panther is a growth-oriented precious metals producer focused on the Americas. The Company owns a portfolio of assets in
Brazil
,
Mexico
and
Peru
that includes three gold and silver mines, an advanced development project and a large land package with district-scale potential. Great Panther is focused on creating long-term stakeholder value through safe and sustainable production, reinvesting into exploration and pursuing acquisition opportunities to complement its existing portfolio. Great Panther trades on the Toronto Stock Exchange trading under the symbol GPR and on the NYSE American under the symbol GPL.
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of Canadian securities laws (together, “forward-looking statements”). Such forward-looking statements may include, but are not limited to, statements regarding (i) the Company’s ability to maximize the full potential of the Tucano Gold Mine in
Brazil
through production, development and exploration, (ii) the consummation and timing of closing the Agreement to sell MMR, and (iii) the Company’s safe and sustainable production, reinvestment into exploration and pursuit of acquisition opportunities in the Americas to complement its existing portfolio.
These forward-looking statements and information reflect the Company’s current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory risks and uncertainties, including risks described in respect of Great Panther in its most recent annual information form and management’s discussion and analysis filed with the Canadian Securities Administrators and available at
www.sedar.com
and its most recent annual report on Form 40-F and management’s discussion and analysis on Form 6-K filed with the Securities and Exchange Commission and available at
www.sec.gov
.
There is no assurance that these forward-looking statements will prove accurate or that actual results will not vary materially from these forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described, or intended. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward-looking statements and information are designed to help readers understand management’s current views of our near- and longer-term prospects and may not be appropriate for other purposes. The Company does not intend, nor does it assume any obligation to update or revise forward-looking statements or information, whether as a result of new information, changes in assumptions, future events or otherwise, except to the extent required by applicable law.
View original content to download multimedia:
https://www.prnewswire.com/news-releases/great-panther-reports-second-quarter-2022-production-results-301590613.html
SOURCE Great Panther Mining Limited