Alexco Reports Final Results from 2021 Bermingham Drilling Program, Composite Assays to 1,383 g/t Ag over 11.09 Meters True Width

<br /> Alexco Reports Final Results from 2021 Bermingham Drilling Program, Composite Assays to 1,383 g/t Ag over 11.09 Meters True Width<br />

PR Newswire

High Grade Silver Mineralization Confirmed along 500 meter Zone


VANCOUVER, BC

,

Dec. 16, 2021

/PRNewswire/ –

Alexco Resource Corp.

(NYSE American: AXU) (TSX: AXU) (“Alexco” or the “Company”) today reported the balance of results from its 2021 directional drilling program at the Bermingham Northeast Deep zone in the Keno Hill Silver District,

Yukon Territory

(”


Keno Hill


“). The 17,742 meter (”

m

“) drill program completed 52 intercepts through the multi-vein target zone, which extends approximately

500 m

along strike with at least a

100 m

vertical extent. Initial results were reported on

September 7, 2021

(

see news release

). With all assays now received, the Company is calculating a revised estimated mineral resource for the Bermingham deposit, which currently contains a silver resource of 32.96 million ounces (”

Moz

“) Indicated (including 18.2 Moz Probable Reserve) and 11.74 Moz Inferred (

see news release

). The resource estimation of the newly defined zone is expected to be complete before year end 2021.



2021 Exploration Results Highlights

Final results from 2021 Northeast Deep zone drilling (Table 1) confirm the presence of a

500 m

long sub-horizontal mineralized zone (Figure 1) with at least a

100 m

vertical extent located approximately

150 m

below the Bermingham Northeast mining reserve.

In addition to the important intercepts previously reported from initial results in

September 2021

(

see news release

), the more significant intercepts from the balance of the drilling (Table 2) are highlighted below:


  • K-21-0800A

    intersected the Bermingham Main vein over a true width of

    11.09 m

    from

    187.75 m

    containing 1,383 grams per tonne (”

    g/t

    “) (44.45 ounces per tonne (”

    oz/t

    “)) silver (”

    Ag

    “), including

    3.33 m

    true width from

    189.00 m

    containing 2,959 g/t (95.14 oz/t) Ag.

  • K-21-0803A

    intersected the Bermingham Footwall vein over a true width of

    7.85 m

    from

    170.85 m

    containing 1,358 g/t (43.66 oz/t) Ag.

  • K-21-0797A

    intersected the Bermingham Main vein over a true width of

    7.20 m

    from

    207.82 m

    containing 1,082 g/t (34.78 oz/t) Ag.

  • K-21-

    0800B


    intersected the Bermingham Main vein over a true width of

    4.16 m

    from

    216.80 m

    containing 3,226 g/t (103.72 oz/t), including

    3.56 m

    true width from

    216.80 m

    containing 3,748 g/t (120.50 oz/t) Ag.

  • K-21-0803

    intersected the Bermingham Footwall vein over a true width of

    5.41 m

    from

    478.58 m

    containing 1,331 g/t (42.80 oz/t) Ag.

  • K-21-0800

    intersected the Bermingham Footwall vein over a true width of

    4.49 m

    from

    464.65 m

    containing 1,205 g/t (38.73 oz/t) Ag.

  • K-21-

    0799B


    intersected the Bermingham Footwall vein over a true width of

    6.20 m

    from

    270.30 m

    containing 888 g/t (28.56 oz/t) Ag.

  • K-21-

    0796B


    intersected the Bermingham Footwall vein over a true width of

    5.43 m

    from

    299.50 m

    containing 996 g/t (32.03 oz/t) Ag.

  • K-21-0792D

    intersected the BM2 vein over a true width of

    3.02 m

    from

    164.32 m

    containing 1,273 g/t (40.93 oz/t) Ag.

As in previous years, assay results are reported in Table 2 as +30 g/t Ag composite intervals (that may contain up to two meters of unmineralized material) as in essence this outlines the mineralized vein structures. Table 2 also includes +900 g/t Ag composites for comparison, this being the Bermingham Probable Reserve silver grade.

Alexco’s Chairman and CEO,

Clynt Nauman

commented, “The 2021 infill and extension directional drilling program at Bermingham was very successful – and we have now turned our attention to the calculation of a revised mineral resource estimate for the Bermingham deposit. Without question, this discovery is important from an exploration perspective, but with mining operations at Bermingham already underway and with infrastructure planned to be within approximately

200 m

of the newly defined mineralized zone, we are working with urgency to understand the size and tenor of the potentially expanded resource. Understanding the geology of the entire Bermingham deposit has significant exploration implications in a district where historically silver mineralization was considered shallow and discontinuous. There remains extensive areas along several kilometers of the vein-fault systems yet to be drill tested in favourable stratigraphy at depth. In particular, these areas include the northeastern extension of the Bermingham deposit towards the historic Hector-Calumet mine, as well as southwest to the Coral Wigwam prospect and beyond to the west.”



2021 Program Summary and Bermingham Geology

The 2021 exploration program has provided nominal drill intersection spacings of

35 m

along strike by

25 m

dip separation along the subparallel Bermingham Main and Bermingham Footwall veins using directional drilling technology whereby shorter secondary drill-holes were initiated at depth from an existing primary drill-hole. The mineralized Northeast Deep zone is structurally complex with a horizontal to gentle northeast plunge along a strike length of

500 m

and an apparent dip extent exceeding

100 m

– the zone exhibits a mineralogy similar to that seen elsewhere in the Bermingham deposit. Characteristically, mineralized widths that range up to

20 m

are coincident with changes in strike and dip of the hosting fault structure in response to variations in rock competency and proximity to the intersection of the two veins, which can now be traced over a

900 m

strike length throughout the length of the Bermingham deposit. The mineralization is primarily hosted within the thick bedded quartzites of the Keno Hill Quartzite that also host the nearby historical Hector-Calumet deposit.



Operations Update

Ramp up of underground development and ore production continues with increasing ore production to design capacity rates (400 tonnes per day) targeted during Q1 2022. Ore production from the Bellekeno mine is complete with underground assets removed and redeployed and the mine has transitioned into longer term monitoring. At Flame & Moth, an Alimak nest has been completed on the 815 ore access level and the raise contractor is currently advancing the

85 m

ventilation and secondary egress raise to surface. Two initial ore level accesses are being driven on the 815 and 835 levels at Flame & Moth with a target of having five ore production headings opened in early Q1 2022. At Bermingham, the first ore drive on the 1150 level is complete and long hole drilling is underway. Longhole stoping in the 1150 level is anticipated to commence before year end, which will provide a significant increase in ore tonnes delivered from Bermingham. In the mill, the installation of new concentrate regrind mills is complete and the installation of the secondary grinding mill has also been completed and commissioned. With commissioning of the secondary grinding mill using Bermingham ore feed, extended periods of throughput at 17 tonnes per hour (400 tonnes per day run rate) has been achieved along with design metallurgical performance and concentrate Ag grades in excess of 18,000 g/t being produced.



Retirement of

Al McOnie

, VP Exploration

Alexco also announces that Mr.

Al McOnie

, Vice President, Exploration, has decided to retire from the Company after more than 15 years of service, effective

December 31


st

, 2021.  “Al has been a trusted friend and an exceptional leader at Alexco,” said

Clynt Nauman

, Alexco’s Chairman and CEO. “There can be no doubt that the incredible success of our exploration efforts over the past decade would not have been possible without Al and his leadership. On behalf of the Board and employees at Alexco, we wish Al the very best in his retirement.”

Going forward, Ms.

Liana Stammers

, P.Geo, Alexco’s Senior Exploration Geologist, will serve as the Company’s Qualified Person for exploration related topics.

Al McOnie

has agreed to continue to be available to the Company to provide strategic advice regarding future exploration initiatives



Qualified Persons and Procedures

The 2019 – 2021 exploration drill programs and sampling protocol has been reviewed, verified, and compiled by Alexco’s geologic staff under the supervision of

Alan McOnie

, FAusIMM, Vice President Exploration and

Liana Stammers

, P.Geo, Senior Exploration Geologist, while that regarding mine development and operations has been reviewed and approved by

Neil Chambers

, P.Eng., Chief Mine Engineer, all of whom are Qualified Persons as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Compared with previous years, the core sampling protocols have varied from sampling half HQ core, as more holes have been completed in NQ core in some daughter holes where essentially whole core assay sampling has been undertaken to ensure adequate sample size, providing adequate representative sample material has been retained and high resolution core photography undertaken.

A rigorous quality control and quality assurance protocol is used on the project, including blank, duplicate, and standard reference samples in each batch of 20 samples delivered to the assay lab. Drill core samples are shipped internally to ALS Minerals Labs at

Whitehorse

,

Yukon

for preparation, with multi-element ICP, fire assay and overlimit analyses completed at the ALS Minerals facility in

North Vancouver, British Columbia

.


About Alexco

Alexco is a Canadian primary silver company that owns and operates the majority of the historic Keno Hill Silver District, in

Canada’s


Yukon Territory

, one of the highest-grade silver deposits in the world. Alexco is currently advancing

Keno Hill

to commercial production and commenced concentrate production and shipments in the first quarter of 2021.

Keno Hill

is expected to produce an average of approximately 4.4 million ounces of silver per year contained in high quality lead/silver and zinc concentrates.

Keno Hill

retains significant potential to grow and Alexco has a long history of expanding the operation’s mineral resources through successful exploration


Forward-Looking Statements


Some statements (“forward-looking statements”) in this news release contain forward-looking information concerning Alexco’s anticipated results and developments in Alexco’s operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future, made as of the date of this news release.  Forward-looking statements may include, but are not limited to, statements with respect to the future remediation and reclamation activities, future mineral exploration, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, future mine construction and development activities, future mine operation and production, the timing of activities and reports, the amount of estimated revenues and expenses, the success of exploration activities, permitting time lines, requirements for additional capital and sources and uses of funds. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors, which could cause actual events or results to differ from those expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results and timing of exploration and development activities; actual results and timing of mining activities; actual results and timing of environmental services activities; actual results and timing of remediation and reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of silver, gold, lead, zinc and other commodities; possible variations in mineable resources, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; First Nation rights and title; continued capitalization and commercial viability; global economic conditions; competition; and delays in obtaining governmental approvals or financing or in the completion of development activities.  Forward-looking statements are based on certain assumptions that management believes are reasonable at the time they are made. In making the forward-looking statements included in this news release, Alexco has applied several material assumptions, including, but not limited to, the assumption that Alexco will be able to raise additional capital as necessary, that the proposed exploration and development will proceed as planned, and that market fundamentals will result in sustained silver, gold, lead and zinc demand and prices. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Alexco expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as otherwise required by applicable securities legislation.


APPENDICES


Table 1 – Location of 2021 Drill Holes with completed assays in this Release



Hole



East (m)



North (m)



Elevation (m)



Length (m)



Surface Azimuth



Surface Dip


K-21-0789D *


479664.78


7087155.44


1090.56


270.00


302.0


-74.0


K-21-0791B *


479548.60


7086986.19


1054.28


222.00


302.9


-66.4


K-21-0792D *


479599.95


7087059.77


1070.61


267.09


290.8


-71.9


K-21-0793


482175.92


7088302.35


1276.06


224.00


338.0


-56.0


K-21-0794A *


479503.60


7086909.00


1125.50


308.00


273.8


-64.4


K-21-0795


479770.41


7087087.93


1368.68


38.00


278.0


-71.0


K-21-0796 *


479770.36


7087087.84


1368.71


530.00


278.0


-72.5


K-21-0796A


479696.39


7087107.53


1139.48


320.00


291.7


-64.3


K-21-0796B


479707.63


7087102.94


1166.91


333.00


295.2


-67.0


K-21-0796C


479650.19


7087131.90


1014.99


219.80


300.4


-63.7


K-21-0796D *


479659.22


7087127.47


1036.77


217.58


296.7


-66.8


K-21-0797 *


479602.96


7086902.78


1367.25


585.50


255.0


-62.0


K-21-0797A *


479475.45


7086876.29


1111.58


292.50


266.6


-60.1


K-21-0798 *


479615.65


7086913.83


1367.43


539.00


266.0


-71.0


K-21-0798A *


479497.34


7086918.22


1061.90


286.00


294.6


-68.1


K-21-0799


479648.72


7086932.52


1369.23


528.00


300.0


-75.0


K-21-0799A


479583.07


7086983.11


1097.07


260.00


313.4


-60.3


K-21-0799B


479588.44


7086978.21


1111.33


291.00


312.0


-64.0


K-21-0799C *


479594.63


7086972.77


1130.64


336.15


309.9


-68.3


K-21-0800


479484.94


7086725.39


1369.35


539.00


308.0


-65.0


K-21-0800A


479397.86


7086804.86


1124.35


249.00


315.1


-58.9


K-21-0800B


479405.94


7086796.32


1145.27


279.00


315.8


-61.9


K-21-0800C *


479409.86


7086792.42


1155.92


262.36


314.5


-63.1


K-21-0800D


479381.12


7086816.32


1084.18


180.89


305.8


-56.8


K-21-0801 *


479731.29


7086977.72


1372.36


540.00


307.0


-69.0


K-21-0801A


479629.04


7087074.10


1049.37


198.00


315.9


-56.1


K-21-0801B


479647.64


7087056.91


1090.12


276.00


310.3


-61.8


K-21-0801C


479650.65


7087054.21


1098.16


219.30


313.3


-64.1


K-21-0802 *


479648.35


7086932.32


1369.29


551.00


279.0


-72.0


K-21-0802A


479556.41


7086960.96


1086.64


258.00


295.8


-61.6


K-21-0803 *


479485.01


7086725.54


1369.32


506.00


317.0


-64.0


K-21-0803A


479391.20


7086837.93


1091.77


202.08


322.6


-59.2



Notes


*  NQ cored


Locations in UTM NAD83 -Z8 projection located by survey controlled RTK GPS


Collars of daughter holes (A, B, C, D) located at take off point from parent hole


Downhole surveys by gyro or single shot reflex


Table 2 – +30 g/t and +900 g/t Ag Composite Assay Intervals



Hole



From

(m)



To



(m)



Interval

(m)



True Width

(m)



Ag

(g/t)



Ag

(oz/t)



Au

(g/t)



Pb

(%)



Zn

(%)



Vein


K-21-0789D


158.18


161.50


3.32


2.78


92


2.95


0.04


1.28


2.60


BM2


195.00


195.40


0.40


0.34


485


15.59


0.06


0.71


0.01


BM Splay


198.25


201.65


3.40


2.87


365


11.72


0.04


0.45


0.01


BM


Including


198.25


200.60


2.35


1.98


468


15.03


0.04


0.58


0.01


BM


K-21-0791B


206.33


206.80


0.47


0.30


132


4.24


0.16


1.25


0.04


BM


210.00


214.02


4.02


2.59


251


8.06


0.10


0.60


0.02


BM


216.97


217.27


0.30


0.20


198


6.37


0.12


0.58


0.02


BM


K-21-0792D


164.32


167.92


3.60


3.02


1273


40.93


0.54


5.88


2.04


BM2


Including


166.43


167.92


1.49


1.25


2848


91.56


0.65


6.89


2.55


BM2


233.21


233.37


0.16


0.09


844


27.14


0.13


7.74


0.45


FW splay


244.02


250.41


6.39


3.51


609


19.56


0.13


3.16


0.18


FW


Including


244.43


248.08


3.65


2.01


973


31.28


0.19


5.05


0.14


FW


259.60


262.25


2.65


1.46


46


1.49


0.01


0.18


0.00


FW splay


K-21-0793


211.57


213.13


1.56


1.19


150


4.81


0.09


1.96


5.60


Sime Aho


215.65


216.35


0.70


0.53


53


1.70


0.11


0.18


1.14


Sime Aho Splay


221.32


222.64


1.32


0.97


137


4.40


0.13


0.41


7.49


Sime Ruby


K-21-0794A


237.45


238.42


0.97


0.84


848


27.26


0.24


3.20


1.69


BM


Including


237.83


238.12


0.29


0.25


2040


65.59


0.59


2.67


1.73


BM


280.26


281.05


0.79


0.45


1795


57.71


0.28


13.30


1.45


FW


K-21-0796


467.60


469.35


1.75


1.61


1607


51.65


0.23


1.73


1.44


BM2


Including


468.55


469.35


0.80


0.74


2790


89.70


0.40


2.44


0.98


BM2


501.75


504.45


2.70


1.97


859


27.62


0.09


3.29


0.85


FW


Including


502.90


503.40


0.50


0.36


4080


131.17


0.36


14.82


2.56


FW


509.66


510.13


0.47


0.34


68


2.19


0.04


1.10


1.69


FW splay


512.86


514.50


1.64


1.20


45


1.45


0.04


0.38


1.07


FW splay


517.00


518.30


1.30


0.95


446


14.34


0.08


6.52


8.71


FW splay


Including


517.00


517.40


0.40


0.29


1170


37.62


0.10


18.15


4.90


FW splay


K-21-0796A


258.14


258.86


0.72


0.66


118


3.79


0.02


0.33


0.11


BM


261.52


262.45


0.93


0.85


99


3.19


0.06


0.13


0.04


BM splay


287.76


288.48


0.72


0.48


84


2.70


0.02


0.29


1.51


FW splay


290.50


290.98


0.48


0.32


551


17.72


0.12


3.06


2.04


FW


K-21-0796B


256.28


256.80


0.52


0.50


44


1.41


-0.01


0.01


0.01


BM2


299.50


306.74


7.24


5.43


996


32.03


0.18


3.02


1.15


FW


Including


299.50


301.11


1.61


1.21


4216


135.55


0.71


11.96


3.62


FW


K-21-0796C


93.26


93.96


0.70


0.64


32


1.03


0.22


0.13


0.21


BM2


124.39


125.59


1.20


1.10


988


46.30


0.17


0.26


0.14


BM


Including


124.39


125.14


0.75


0.69


1440


46.30


0.23


0.33


0.22


BM


154.67


156.90


2.23


1.52


153


4.90


0.06


0.60


0.37


FW


Including


155.66


155.90


0.24


0.16


992


31.89


0.34


4.58


1.90


FW


K-21-0796D


161.60


163.00


1.40


1.25


34


1.10


0.03


0.06


0.01


BM


191.70


196.10


4.40


2.73


530


17.03


0.08


0.26


0.64


FW   *


Including


191.70


192.05


0.35


0.22


1675


53.85


0.12


0.88


0.13


FW


194.75


195.43


0.68


0.42


2349


75.52


0.32


1.00


1.74


FW


K-21-0797


496.91


500.19


3.28


2.88


653


20.98


0.33


2.85


3.46


BM


Including


496.91


498.44


1.53


1.34


1182


38.01


0.49


4.21


2.72


BM


515.81


517.10


1.29


1.14


986


31.69


0.14


0.33


3.70


BM splay


Including


515.81


516.17


0.36


0.32


3390


108.99


0.44


0.15


9.53


BM splay


549.70


550.73


1.03


0.71


255


8.19


0.15


0.20


0.21


FW


552.92


553.43


0.51


0.35


1300


41.80


0.39


0.02


0.03


FW


562.54


562.75


0.21


0.14


341


10.96


0.13


5.75


7.71


FW splay


K-21-0797A


207.82


216.00


8.18


7.20


1082


34.78


0.32


5.47


4.92


BM


Including


208.45


215.12


6.67


5.87


1233


39.65


0.33


6.54


5.89


BM


271.88


273.90


2.02


1.30


275


8.84


0.07


0.24


1.12


FW


Including


273.45


273.90


0.45


0.29


1010


32.47


0.17


0.17


4.62


FW


K-21-0798


509.00


511.50


2.50


1.96


177


5.70


0.04


1.60


0.58


FW


K-21-0798A


178.27


180.74


2.47


2.18


216


6.94


0.13


1.39


0.19


BM


Including


178.93


179.15


0.22


0.19


1440


46.30


0.83


6.30


2.00


BM


184.85


187.40


2.55


2.26


76


2.44


0.04


1.07


0.49


BM splay


214.96


215.27


0.31


0.18


55


1.75


0.09


0.50


0.03


FW splay


235.00


237.23


2.23


1.31


37


1.18


0.01


0.02


0.08


FW


270.18


271.30


1.12


0.66


97


3.13


0.02


0.00


0.00


Unknown Vein


K-21-0799


483.45


485.52


2.07


2.01


1121


36.03


0.33


3.07


5.19


BM2


Including


483.45


484.49


1.04


1.01


2011


64.67


0.39


5.69


8.44


BM2


488.70


490.63


1.93


1.87


32


1.03


0.01


0.14


0.21


BM2 splay


493.00


494.98


1.98


1.91


75


2.40


0.02


0.86


0.70


BM splay


498.03


498.94


0.91


0.88


653


20.99


0.10


1.68


0.03


BM


502.65


509.81


7.16


5.56


255


8.19


0.02


1.16


0.41


FW


Including


502.65


502.80


0.15


0.12


9090


292.25


0.79


34.55


2.08


FW


515.00


517.03


2.03


1.58


114


3.65


0.03


1.64


0.88


FW splay


K-21-0799A


203.15


208.60


5.45


5.06


162


5.19


0.02


0.35


1.99


BM2


212.29


213.45


1.16


1.08


137


4.42


0.08


1.88


1.52


BM


245.00


245.44


0.44


0.30


80


2.59


0.09


0.62


0.62


FW


K-21-0799B


223.10


227.00


3.90


3.58


34


1.09


0.00


0.07


0.44


BM2


232.87


234.65


1.78


1.64


53


1.71


0.02


0.35


0.42


BM splay


254.40


256.00


1.60


1.07


35


1.12


0.03


0.27


0.02


FW splay


270.30


279.55


9.25


6.20


888


28.56


0.16


0.82


0.94


FW


Including


275.16


278.30


3.14


2.11


2217


71.26


0.36


1.85


0.77


FW


K-21-0799C


255.00


255.68


0.68


0.62


104


3.34


0.01


0.01


0.03


BM2


319.16


323.36


4.20


2.69


149


4.79


0.04


0.19


0.04


FW


Including


320.90


321.31


0.41


0.26


1020


32.79


0.15


0.04


0.02


FW


K-21-0800


353.00


353.61


0.61


0.51


718


23.08


0.08


1.97


0.19


Aho splay


457.86


458.58


0.72


0.71


94


3.03


0.01


1.18


1.34


BM splay


461.00


462.34


1.34


1.31


157


5.05


0.05


0.58


2.21


BM


464.65


470.00


5.35


4.49


1205


38.73


0.21


1.17


1.13


FW


Including


465.94


469.56


3.62


3.04


1607


51.68


0.26


1.51


1.35


FW


K-21-0800A


187.75


199.42


11.67


11.09


1383


44.45


0.28


4.45


4.02


BM


Including


189.00


192.51


3.51


3.33


2959


95.14


0.57


8.08


5.05


BM


Including


197.26


198.98


1.72


1.63


2054


66.03


0.21


9.14


1.07


BM


207.77


207.96


0.19


0.18


556


17.88


0.02


0.09


33.96


BM splay


214.63


237.72


23.09


16.86


394


12.65


0.09


1.88


3.95


FW   **


Including


216.42


217.91


1.49


1.09


2563


82.40


0.24


6.40


20.66


FW


Including


221.43


221.89


0.46


0.34


1165


37.46


0.22


25.49


2.67


FW


Including


230.29


235.00


4.71


3.44


643


20.66


0.13


1.48


2.28


FW


K-21-0800B


121.43


121.61


0.18


0.13


221


7.11


0.16


0.87


0.01


Aho splay


216.80


221.27


4.47


4.16


3226


103.72


0.73


12.31


3.05


BM


Including


216.80


220.63


3.83


3.56


3748


120.50


0.85


14.37


2.97


BM


241.42


241.72


0.30


0.21


1105


35.53


0.16


0.09


0.15


FW splay


244.23


246.56


2.33


1.65


76


2.43


0.03


0.06


0.43


FW splay


253.27


255.64


2.37


1.68


238


7.65


0.09


2.30


3.81


FW


Including


253.91


254.11


0.20


0.14


2140


68.80


0.26


21.64


2.05


FW


263.68


264.42


0.74


0.53


383


12.31


0.07


3.45


0.12


FW splay


K-21-0800C


214.15


220.35


6.20


6.08


42


1.36


0.10


0.16


0.31


BM


242.75


244.27


1.52


1.25


1202


38.64


0.13


11.04


0.90


FW


Including


243.68


243.97


0.29


0.24


5580


179.40


0.58


48.77


4.39


FW


K-21-0800D


54.90


57.94


3.04


2.10


127


4.08


0.26


0.30


0.82


Aho splay


135.81


139.16


3.35


3.25


62


2.00


0.18


0.27


0.47


BM


149.35


149.60


0.25


0.20


165


5.30


0.26


0.05


0.06


FW splay


163.58


170.88


7.30


5.69


673


21.64


0.12


2.68


1.95


FW


Including


163.58


164.44


0.86


0.67


4255


136.81


0.65


12.97


0.46


FW


K-21-0801


487.27


489.41


2.14


2.10


62


2.00


0.03


0.66


1.93


BM2


520.30


524.63


4.33


3.46


87


2.79


0.04


0.35


0.65


FW


530.63


532.75


2.12


1.70


596


19.15


0.10


1.62


0.18


FW


Including


530.63


531.37


0.74


0.59


1535


49.35


0.19


4.17


0.45


FW


K-21-0801A


134.01


138.59


4.58


4.40


389


12.51


0.07


0.81


0.74


BM2


Including


137.43


137.82


0.39


0.37


2110


67.84


0.14


5.61


0.13


BM2


153.49


157.48


3.99


3.83


165


5.32


0.06


2.00


1.04


BM


Including


153.49


153.71


0.22


0.21


2230


71.70


0.33


31.22


11.65


BM


166.89


167.57


0.68


0.51


55


1.76


0.03


1.13


0.55


FW splay


174.18


174.77


0.59


0.44


525


16.88


0.09


0.17


0.56


FW splay


177.00


179.34


2.34


1.80


450


14.47


0.07


0.14


2.15


FW


186.89


187.36


0.47


0.36


1640


52.73


0.32


4.42


2.24


FW splay


K-21-0801B


183.46


187.58


4.12


3.79


497


15.99


0.09


1.08


0.29


BM2


Including


185.39


186.36


0.97


0.89


1380


44.37


0.19


2.62


0.59


BM2


207.66


208.27


0.61


0.56


171


5.50


0.06


2.85


0.40


BM


245.49


254.41


8.92


5.98


216


6.96


0.06


0.63


1.07


FW


Including


247.10


247.40


0.30


0.20


3160


101.60


0.57


3.26


0.41


FW


K-21-0802


500.30


519.69


19.39


14.54


618


19.86


0.13


1.78


0.59


FW


Including


500.30


504.01


3.71


2.78


1420


45.65


0.32


5.40


0.69


FW


Including


511.28


512.85


1.57


1.18


3126


100.51


0.54


5.56


2.34


FW


K-21-0802A


208.95


210.00


1.05


0.97


302


9.71


0.08


1.46


3.91


BM


228.16


240.00


11.84


9.24


370


11.91


0.07


1.43


0.41


FW


Including


235.06


238.59


3.53


2.75


908


29.18


0.15


3.09


0.84


FW


K-21-0803


341.59


342.81


1.22


0.92


57


1.85


0.07


0.26


1.22


Aho splay


461.83


462.08


0.25


0.24


88


2.83


0.09


0.65


4.24


BM splay


464.73


476.34


11.61


11.15


543


17.46


0.21


0.80


1.18


BM


Including


468.07


468.49


0.42


0.40


6560


210.91


1.52


5.07


3.26


BM


Including


472.60


473.33


0.73


0.70


2230


71.70


0.43


2.32


10.15


BM


478.58


485.52


6.94


5.41


1331


42.80


0.25


4.15


4.55


FW


Including


479.20


480.96


1.76


1.37


3198


102.81


0.51


5.73


4.66


FW


Including


483.02


485.00


1.98


1.54


1426


45.83


0.32


6.46


4.14


FW


K-21-0803A


29.03


31.36


2.33


1.70


244


7.84


0.10


0.31


0.95


Aho splay


153.10


160.06


6.96


6.61


349


11.23


0.25


0.98


1.02


BM


Including


153.10


153.72


0.62


0.59


2360


75.88


0.65


4.76


2.24


BM


170.85


181.61


10.76


7.85


1358


43.66


0.18


5.65


3.15


FW


Including


175.64


181.61


5.97


4.36


2370


76.20


0.28


9.66


4.30


FW


30 g/t Ag composite including up to 2m interval internal waste



900 g/t Ag composite including up to 2m interval internal waste


* K-21-0796D FW Vein includes 2.17 m of internal waste (1.35 m true width)


** K-21-0800A FW Vein includes 5.42 m of internal waste (3.96 m true width)

Cision
View original content to download multimedia:

https://www.prnewswire.com/news-releases/alexco-reports-final-results-from-2021-bermingham-drilling-program-composite-assays-to-1-383-gt-ag-over-11-09-meters-true-width-301446944.html

SOURCE Alexco Resource Corp.