Orezone’s Ongoing Grade Control Program Returns Consistent High-Grade Intercepts in the A2 Starter Pit at the Bomboré Gold Project

VANCOUVER, British Columbia, June 09, 2022 (GLOBE NEWSWIRE) —

Orezone Gold Corporation (TSX: ORE, OTCQX: ORZCF)

(the “Company” or “Orezone”) is pleased to report further assay results from the maiden grade control (“GC”) reverse circulation (“RC”) drill program at the Bomboré Gold Project, located in Burkina Faso. GC drilling to-date is focused on near-surface oxide mineralization within the starter pits located in the northern portion of the mining lease. These starter pits will be the source of higher-grade oxide mill feed for the first year of production and are denoted as A1, A2, A3, H1, H2, and H3 (see Figure 1 below). GC results for Pit A2 are now available and similar to Pit A1 (see news release dated April 7, 2022 for A1 Pit GC results), are very encouraging.

Results have returned several significant thicker high-grade intervals where localized zones of higher grades were intersected in several holes which collared or ended in mineralization. Some of these zones reported remain open in several areas (see Figures 2 and 3).


Drilling Highlights


  • 4.00 m of 22.42 g/t Au from 27.00 m

  • 31.00 m of 2.30 g/t Au from 0.00 m

  • 31.00 m of 2.17 g/t Au from 0.00 m

  • 20.00 m of 2.43 g/t Au from 11.00 m

  • 18.00 m of 2.61 g/t Au from 13.00 m

  • 26.00 m of 1.79 g/t Au from 5.00 m

  • 31.00 m of 1.49 g/t Au from 0.00 m

  • 31.00 m of 1.48 g/t Au from 0.00 m

  • 31.00 m of 1.47 g/t Au from 0.00 m

  • 27.00 m of 1.68 g/t Au from 0.00 m

  • 2.00 m of 21.98 g/t Au from 10.00 m

  • 24.00 m of 1.83 g/t Au from 0.00 m

  • 25.00 m of 1.74 g/t Au from 6.00 m

  • 11.00 m of 3.79 g/t Au from 17.00 m

  • 24.00 m of 1.61 g/t Au from 7.00 m

  • 28.00 m of 1.37 g/t Au from 3.00 m

  • 18.00 m of 2.08 g/t Au from 13.00 m

  • 20.00 m of 1.77 g/t Au from 0.00 m

  • 7.00 m of 4.76 g/t Au from 5.00 m

  • 17.00 m of 1.92 g/t Au from 0.00 m

  • 17.00 m of 1.84 g/t Au from 13.00 m

  • 18.00 m of 1.68 g/t Au from 8.00 m

  • 18.00 m of 1.63 g/t Au from 13.00 m

  • 11.00 m of 2.67 g/t Au from 7.00 m

  • 9.00 m of 3.22 g/t Au from 14.00 m

  • 18.00 m of 1.53 g/t Au from 3.00 m

  • 9.00 m of 2.90 g/t Au from 19.00 m

  • 15.00 m of 1.74 g/t Au from 10.00 m

  • 10.00 m of 2.56 g/t Au from 21.00 m

  • 12.00 m of 2.07 g/t Au from 4.00 m

  • 12.00 m of 2.05 g/t Au from 9.00 m

  • 10.00 m of 2.40 g/t Au from 21.00 m

  • 5.00 m of 4.73 g/t Au from 6.00 m

  • 7.00 m of 3.19 g/t Au from 8.00 m

  • 5.00 m of 3.60 g/t Au from 0.00 m

  • 9.00 m of 1.92 g/t Au from 22.00 m

  • 11.00 m of 1.52 g/t Au from 0.00 m

  • 6.00 m of 2.73 g/t Au from 5.00 m

  • 4.00 m of 3.51 g/t Au from 0.00 m

Patrick Downey, President and CEO stated, “The GC drilling results at the A2 starter pit are extremely robust and have not only confirmed but extended the higher-grade zones within our resource and reserve models for Bomboré. These higher-grade zones are up to 60 m thick with average widths of 15 m to 30 m with ore starting right at surface with several holes ending in mineralization. These zones continue up to the A3 pit and beyond towards the northeast, and we will now expand the GC program to incorporate this additional area. We expect to outline an enlarged higher-grade starter pit that will encompass all of the A1, A2, and A3 pits. The GC program is also continuing at the H1 and H2 higher-grade starter pits in the P8/P9 area located in close proximity to the process plant. Mining from all of these pits will provide better grade oxide ore feed for the first 12 to 15 months of operations. We remain on-time and on-budget for first gold in Q3 of this year and look forward to delivering strong early gold production as supported by these impressive recent and on-going GC results.”



Figure 1: North Pits Plan View


is available at



https://www.globenewswire.com/NewsRoom/AttachmentNg/4db5a20f-4286-4103-b69b-0e670a851168


Figure 2: Maga Area Resources and Reserve Drilling Plan View

is available at



https://www.globenewswire.com/NewsRoom/AttachmentNg/383a65d2-4fc1-49cd-b029-b1b241a2d53c


Figure 3: Maga Area Grade Control Drilling Plan View

is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/f28b5aae-e3da-43a0-a3ea-60cc06a76ee5


Figure 4: A2 Pit Resources and Reserve Drilling Plan View

is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/b3999818-f7d5-4407-9301-c0e6f2927d0e


Figure 5: A2 Pit Grade Control Drilling Plan View

is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/57ad2499-088f-45d8-bdb1-f55b7ffa651b


Table 1: A2 Starter Pit Drilling Highlights

Hole

#
From

(m)
To

(m)
Length

(m)*
Grade

(g/t gold)
MAGA-GCA2-0337 27.00 31.00 4.00 22.42
MAGA-GCA2-0254 0.00 31.00 31.00 2.30
MAGA-GCA2-0146 0.00 31.00 31.00 2.17
MAGA-GCA2-0060 11.00 31.00 20.00 2.43
MAGA-GCA2-0132 13.00 31.00 18.00 2.61
MAGA-GCA2-0204 5.00 31.00 26.00 1.79
MAGA-GCA2-0215 0.00 31.00 31.00 1.49
MAGA-GCA2-0236 0.00 31.00 31.00 1.48
MAGA-GCA2-0247 0.00 31.00 31.00 1.47
MAGA-GCA2-0253 0.00 27.00 27.00 1.68
MAGA-GCA2-0343 10.00 12.00 2.00 21.98
MAGA-GCA2-0059 0.00 24.00 24.00 1.83
MAGA-GCA2-0216 6.00 31.00 25.00 1.74
MAGA-GCA2-0328 17.00 28.00 11.00 3.79
MAGA-GCA2-0271 7.00 31.00 24.00 1.61
MAGA-GCA2-0263 3.00 31.00 28.00 1.37
MAGA-GCA2-0163 13.00 31.00 18.00 2.08
MAGA-GCA2-0145 0.00 20.00 20.00 1.77
MAGA-GCA2-0255 0.00 31.00 31.00 1.14
MAGA-GCA2-0094 5.00 12.00 7.00 4.76
MAGA-GCA2-0270 0.00 17.00 17.00 1.92
MAGA-GCA2-0235 0.00 24.00 24.00 1.36
MAGA-GCA2-0027 13.00 30.00 17.00 1.84
MAGA-GCA2-0124 0.00 21.00 21.00 1.49
MAGA-GCA2-0077 0.00 21.00 21.00 1.48
MAGA-GCA2-0033 8.00 26.00 18.00 1.68
MAGA-GCA2-0272 13.00 31.00 18.00 1.63
MAGA-GCA2-0213 7.00 18.00 11.00 2.67
MAGA-GCA2-0095 14.00 23.00 9.00 3.22
MAGA-GCA2-0120 3.00 21.00 18.00 1.53
MAGA-GCA2-0331 19.00 28.00 9.00 2.90
MAGA-GCA2-0286 10.00 25.00 15.00 1.74
MAGA-GCA2-0045 21.00 31.00 10.00 2.56
MAGA-GCA2-0157 0.00 17.00 17.00 1.50
MAGA-GCA2-0137 1.00 19.00 18.00 1.39
MAGA-GCA2-0203 4.00 16.00 12.00 2.07
MAGA-GCA2-0044 9.00 21.00 12.00 2.05
MAGA-GCA2-0288 11.00 31.00 20.00 1.21
MAGA-GCA2-0167 10.00 28.00 18.00 1.33
MAGA-GCA2-0214 21.00 31.00 10.00 2.40
MAGA-GCA2-0055 13.00 31.00 18.00 1.32
MAGA-GCA2-0340 6.00 11.00 5.00 4.73
MAGA-GCA2-0227 0.00 21.00 21.00 1.11
MAGA-GCA2-0102 8.00 26.00 18.00 1.29
MAGA-GCA2-0152 13.00 25.00 12.00 1.86
MAGA-GCA2-0205 8.00 15.00 7.00 3.19
MAGA-GCA2-0070 0.00 20.00 20.00 1.10
MAGA-GCA2-0144 0.00 18.00 18.00 1.20
MAGA-GCA2-0112 6.00 21.00 15.00 1.34
MAGA-GCA2-0237 18.00 31.00 13.00 1.54
MAGA-GCA2-0327 3.00 16.00 13.00 1.53
MAGA-GCA2-0294 0.00 11.00 11.00 1.74
MAGA-GCA2-0066 14.00 29.00 15.00 1.26
MAGA-GCA2-0280 17.00 26.00 9.00 2.08
MAGA-GCA2-0273 11.00 29.00 18.00 1.03
MAGA-GCA2-0166 0.00 11.00 11.00 1.66
MAGA-GCA2-0162 0.00 10.00 10.00 1.81
MAGA-GCA2-0249 0.00 5.00 5.00 3.60
MAGA-GCA2-0117 13.00 24.00 11.00 1.64
MAGA-GCA2-0308 8.00 16.00 8.00 2.24
MAGA-GCA2-0179 9.00 31.00 22.00 0.81
MAGA-GCA2-0226 0.00 14.00 14.00 1.26
MAGA-GCA2-0088 0.00 9.00 9.00 1.93
MAGA-GCA2-0138 6.00 19.00 13.00 1.34
MAGA-GCA2-0282 8.00 23.00 15.00 1.16
MAGA-GCA2-0336 12.00 19.00 7.00 2.47
MAGA-GCA2-0256 22.00 31.00 9.00 1.92
MAGA-GCA2-0285 0.00 11.00 11.00 1.52
MAGA-GCA2-0323 5.00 11.00 6.00 2.73
MAGA-GCA2-0147 17.00 28.00 11.00 1.46
MAGA-GCA2-0226 20.00 27.00 7.00 2.29
MAGA-GCA2-0156 6.00 19.00 13.00 1.23
MAGA-GCA2-0081 26.00 31.00 5.00 3.17
MAGA-GCA2-0208 8.00 21.00 13.00 1.21
MAGA-GCA2-0138 23.00 31.00 8.00 1.96
MAGA-GCA2-0078 21.00 30.00 9.00 1.74
MAGA-GCA2-0172 12.00 26.00 14.00 1.10
MAGA-GCA2-0281 15.00 31.00 16.00 0.96
MAGA-GCA2-0187 13.00 27.00 14.00 1.08
MAGA-GCA2-0234 14.00 20.00 6.00 2.52
MAGA-GCA2-0292 0.00 12.00 12.00 1.26
MAGA-GCA2-0040 0.00 16.00 16.00 0.94
MAGA-GCA2-0103 21.00 31.00 10.00 1.49
MAGA-GCA2-0200 18.00 31.00 13.00 1.10
MAGA-GCA2-0335 0.00 4.00 4.00 3.51
MAGA-GCA2-0309 21.00 30.00 9.00 1.55
MAGA-GCA2-0234 0.00 9.00 9.00 1.51
MAGA-GCA2-0313 9.00 17.00 8.00 1.68
MAGA-GCA2-0217 20.00 31.00 11.00 1.22
MAGA-GCA2-0318 6.00 14.00 8.00 1.67
MAGA-GCA2-0316 0.00 5.00 5.00 2.65
MAGA-GCA2-0113 26.00 31.00 5.00 2.62
MAGA-GCA2-0189 17.00 31.00 14.00 0.94
MAGA-GCA2-0279 0.00 7.00 7.00 1.79
MAGA-GCA2-0008 0.00 7.00 7.00 1.79
MAGA-GCA2-0186 2.00 16.00 14.00 0.89
MAGA-GCA2-0109 12.00 18.00 6.00 2.06
MAGA-GCA2-0076 0.00 9.00 9.00 1.37
MAGA-GCA2-0214 0.00 14.00 14.00 0.87
MAGA-GCA2-0287 14.00 21.00 7.00 1.75
MAGA-GCA2-0120 26.00 31.00 5.00 2.40
MAGA-GCA2-0145 22.00 31.00 9.00 1.27
MAGA-GCA2-0101 1.00 10.00 9.00 1.25
MAGA-GCA2-0305 9.00 18.00 9.00 1.25
MAGA-GCA2-0139 22.00 31.00 9.00 1.22
MAGA-GCA2-0089 23.00 28.00 5.00 2.16
MAGA-GCA2-0274 5.00 12.00 7.00 1.54
MAGA-GCA2-0125 16.00 24.00 8.00 1.33
MAGA-GCA2-0063 0.00 9.00 9.00 1.17
MAGA-GCA2-0298 0.00 14.00 14.00 0.74
MAGA-GCA2-0074 0.00 6.00 6.00 1.67

* True widths for A2 grade control drilling are approximately 85% of drilled lengths


Grade Control Drilling Program

Drilling was completed on a 12.5 m by 12.5 m pattern over the A2 starter pit to bench elevation 255 m. The GC program has confirmed the widths of the high-grade gold ore zones, generally 15 m to 30 m wide and in some places, up to 60 m wide within the A2 starter pit. The majority of cross-sections have returned significant zones of thick high-grade oxide gold results with several collaring and/or ending in mineralization. The oxide starter pit at A2 is expected to have an average depth of 30 m to 35 m along the main mineralized zone.

These results provide further confidence in both the widths and tenors of mineralization present at A2 prior to the commencement of scheduled mining and processing.

Drilling on-site continues with the RC drill rig now operating at the H1 and H2 open pit areas. Upon completion, the rig will return to expand the GC program from A2 towards the A3 pit to the northeast and towards the A1 pit to the southwest.

A summary plan map of the resource drilling results in the A2 pit prior to the GC drilling is presented in Figure 4 while Figure 5 shows the same area updated with the successful GC drilling results.


About Orezone Gold Corporation

Orezone Gold Corporation (TSX: ORE OTCQX: ORZCF) is a Canadian development company which owns a 90% interest in Bomboré, one of the largest undeveloped gold deposits in Burkina Faso.

The 2019 feasibility study highlights Bomboré as an attractive shovel-ready gold project with forecasted annual gold production of 118,000 ounces over a 13+ year mine life at an All-In Sustaining Cost of US$730/ounce with an after-tax payback period of 2.5 years at an assumed gold price of US$1,300/ounce. Bomboré is underpinned by a mineral resource base in excess of 5 million gold ounces and possesses significant expansion potential. Orezone is fully funded to bring Bomboré into production with the first gold pour scheduled for Q3-2022.

Patrick Downey

President and Chief Executive Officer

Vanessa Pickering

Manager, Investor Relations

Tel: 1 778 945 8977 / Toll Free: 1 888 673 0663

[email protected] / www.orezone.com


Qualified Person

Dr. Pascal Marquis, Geo., Senior VP Exploration is the Qualified Person who has approved the scientific and technical information in this news release.


QA/QC

The grade control program mineralized intervals are based on a lower cut-off grade of 0.28 g/t Au, a minimal width of 4.00 m and up to a maximum of 3.0 m of dilution being included. The true width of the mineralization is approximately 85% of the drilled length. The A2 Pit grade control samples were collected by employees of Orezone Bomboré SA (“OBSA”), Orezone’s 90% owned subsidiary that owns the Project, using the Orezone Reverse Circulation (RC) rig equipped with a Metzke automatic sampler. The average weight of the samples collected was 2.1 kg. All samples from this program were dried and pulverized at the OBSA sample preparation site facility operated by SGS Burkina Faso SA. A 1 kg aliquot was analyzed for leachable gold by bottle-roll cyanidation using a LeachWell

TM

catalyst at BIGS Global Burkina Sarl in Ouagadougou .

Orezone employs a rigorous Quality Control Program including a minimum of 10% standards, blanks, and duplicates.


For further information please contact Orezone at +1 (778) 945-8977 or visit the Company’s website at



www.orezone.com



.


The Toronto Stock Exchange neither approves nor disapproves the information contained in this news release.


Cautionary Note Regarding Forward-Looking Statements


This press release contains certain information that may constitute “forward-looking information” within the meaning of applicable Canadian Securities laws and “forward-looking statements” within the meaning of applicable U.S. securities laws (together, “forward-looking statements”). Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”,


“believe”,


“anticipate”,


“estimate”,


“potential”,


“possible”


and


other


similar


words,


or


statements that certain events or conditions “may”, “will”, “could”, or “should” occur.


Forward-looking statements in this press release include, but are not limited to, statements with respect to future grade control drilling, Bomboré project being fully funded to production and projected first gold by Q3-2022.


All such forward-looking statements are based on certain assumptions and analyses made by management in light of their experience and perception of historical trends, current conditions and expected


future


developments,


as


well


as


other


factors


management


and


the


qualified


persons


believe


are appropriate in the


circumstances.


All forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected


in


the


forward-looking


statements


including,


but


not


limited


to,


delays caused by the COVID-19 pandemic, terrorist or other violent attacks,


the


failure


of


parties


to


contracts to honour contractual commitments, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts to perform as agreed; social


or


labour unrest; changes in commodity prices; unexpected failure or inadequacy of infrastructure, the possibility of project cost overruns or unanticipated costs and expenses, accidents and equipment breakdowns, political risk, unanticipated changes in key management personnel and general economic, market or business conditions, the failure of exploration programs, including drilling programs, to deliver anticipated results and the failure of ongoing and uncertainties relating to the availability and costs of financing needed in the future, and other factors described in the Company’s most recent annual information form and management discussion and analysis filed on SEDAR on www.sedar.com. Readers are cautioned not to place undue reliance on forward-looking statements.


Although the forward-looking statements contained in this press release are based upon what management


of


the


Company


believes


are


reasonable


assumptions,


the


Company


cannot


assure


investors that actual results will be consistent with these forward-looking statements. These forward-looking statements


are


made


as


of


the


date


of


this


press


release


and


are


expressly


qualified


in


their


entirety


by


this cautionary


statement.


Subject


to


applicable


securities


laws,


the


Company


does


not


assume


any


obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this press


release.


Primary Logo