Osisko Windfall Drilling Intercepts More High-Grade

Including 120 g/t Au Over 6.2 Metres

TORONTO, April 13, 2022 (GLOBE NEWSWIRE) — Osisko Mining Inc. (OSK:TSX. “Osisko” or the “Corporation”) is pleased to provide new analytical results from the ongoing drill program at its 100% owned Windfall gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec.

Significant new analytical results presented below include 31 intercepts in 12 underground drill holes and 5 wedges. The infill intercepts are located inside defined January 2022 mineral resource estimate (“MRE”) blocks (

see Osisko news release dated January 10,


2022

). The expansion intercepts are located outside the January 2022 MRE blocks and either expand resource wireframes or are in a defined zone or corridor but do not yet correlate to a specific wireframe.

Osisko Chief Executive Officer John Burzynski commented: “We remain very pleased with the results of our infill and expansion drill program at Lynx. High grade zones continue to be intersected where expected and the expansion drilling continues to define additional zones nearby.”

Selected high-grade intercepts include:

120 g/t Au over 6.2 metres

in OSK-W-21-2287-W14;

67.1 g/t Au over 4.4 metres

in OSK-W-22-2646-W3;

111 g/t Au over 2.5 metres

in WST-22-1009A;

82.6 g/t Au over 2.2 metres

in WST-21-0997;

76.0 g/t Au over 2.3 metres

in WST-21-0974;

63.9 g/t Au over 2.1 metres

in WST-22-0999 and

60.8 g/t Au over 2.2 metres

in OSK-W-22-2540-W13. Maps showing hole locations and full analytical results are available at


www.osiskomining.com


. Maps:

Long Section_Infill EN 20220413

,

Long Section_Expan EN 20220413

,

PR_EN_20220413_Surface

,

PR_EN_20220413_UG

..



Infill Drilling


Hole No.

From (m)

To (m)

Interval (m)

Au (g/t) uncut

Au (g/t)


cut to 100 g/t

Zone

Corridor

OSK-W-21-2287-W14

1253.0

1259.2

6.2

120

51.4

LX4_3449


Lynx 4


including
1256.7 1257.2 0.5 768 100

OSK-W-22-2646-W3

1057.6

1062.5

4.9

15.6

TLX_3158


Triple Lynx


including
1058.3 1058.7 0.4 99.1

WST-21-0839

512.0

514.0

2.0

5.16

LX4_3470


Lynx 4


including
512.3 512.7 0.4 21.9

WST-21-0974

44.0

46.3

2.3

76.0

31.8

TLX_3161


Triple Lynx


including
45.2 45.9 0.7 245 100

WST-21-0979

189.4

194.8

5.4

15.6

12.9

TLX_3154


Triple Lynx


including
192.0 192.5 0.5 130 100

197.1

199.2

2.1

19.3

TLX_3184


Triple Lynx


including
197.4 197.7 0.3 44.4

WST-21-0980

602.8

605.0

2.2

50.3

31.9

LX4_3448


Lynx 4


including
602.8 603.5 0.7 158 100

WST-21-0997

191.1

193.3

2.2

82.6

44.7

TLX_3121


Triple Lynx


including
191.7 192.4 0.7 219 100

WST-22-0999

227.0

229.0

2.0

9.37

TLX_3131


Triple Lynx


including
227.7 228.5 0.8 23.4

351.0

353.1

2.1

4.13

LX4_3405


Lynx 4


including
352.7 353.1 0.4 20.8

376.9

379.0

2.1

63.9

38.8

LX4_3410


Lynx 4


including
377.2 378.0 0.8 166 100

390.5

394.0

3.5

27.4

LX4_3440


Lynx 4


including
393.0 394.0 1.0 76.3

WST-22-1000

202.3

212.0

9.7

3.83

TLX_3145


Triple Lynx


including
204.0 205.2 1.2 11.7

WST-22-1004

320.5

325.3

4.8

5.78

TLX_3131


Triple Lynx


including
324.5 324.8 0.3 18.1

504.0

506.0

2.0

44.7

25.4

LX4_3402


Lynx 4


including
505.5 506.0 0.5 177 100

WST-22-1005

149.2

157.6

8.4

4.96

TLX_3161

Triple Lynx

WST-22-1006

566.7

569.1

2.4

15.1

LX4_3430


Lynx 4


including
566.7 567.0 0.3 89.3

WST-22-1008

147.8

150.0

2.2

8.76

TLX_3161

Triple Lynx

210.0

212.1

2.1

11.0

TLX_3169

Triple Lynx

217.7

220.0

2.3

3.98

TLX_3175

Triple Lynx

226.0

228.0

2.0

5.42

TLX_3175

Triple Lynx

WST-22-1009A

172.0

174.0

2.0

8.64

LXM_3388


Lynx


including
172.8 173.3 0.5 22.9

485.5

488.0

2.5

111

60.3

LX4_3404


Lynx 4


including
485.5 486.1 0.6 240 100

499.0

501.1

2.1

11.7

LX4_3430


Lynx 4


including
499.9 500.6 0.7 32.8

511.0

513.0

2.0

3.52

LX4_3454


Lynx 4


including
511.9 512.3 0.4 14.9

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See

“Quality Control and Reporting Protocols”

below. LXM = Lynx Main, LX4 = Lynx 4 and TLX = Triple Lynx.



Expansion Drilling


Hole No.

From (m)

To (m)

Interval (m)

Au (g/t) uncut

Au (g/t)


cut to 100 g/t

Zone

Corridor

OSK-W-21-2381-W3

1204.2

1210.7

6.5

4.41


TLX_3172


Triple Lynx


including
1209.7 1210.7 1.0 15.6

OSK-W-21-2646-W1

1046.0

1055.4

9.4

11.6


TLX_3158


Triple Lynx


including
1048.4 1048.7 0.3 65.8

and
1054.5 1055.4 0.9 54.7

OSK-W-22-2540-W13

987.8

990.0

2.2

60.8

24.2

TLX_3158


Triple Lynx


including
988.1 988.6 0.5 261 100

OSK-W-22-2646-W3

1181.7

1186.1

4.4

67.1

31.7

TLX_3172


Triple Lynx


including
1184.9 1186.1 1.2 230 100

WST-22-1008

249.0

251.5

2.5

5.05


TLX

Triple Lynx

WST-22-1009A

576.1

578.3

2.2

3.54


LX4


Lynx 4


including
577.5 578.3 0.8 9.57

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See

“Quality Control and Reporting Protocols”

below., LX4 = Lynx 4 and TLX = Triple Lynx.



Drill hole location


Hole No.

Azimuth (°)

Dip (°)

Length (m)

UTM E

UTM N

Elevation

Section

OSK-W-21-2287-W14
116 -53 1338 453607 5435714 404 4075

OSK-W-21-2381-W3
134 -53 1392 453620 5435790 402 4125

OSK-W-21-2646-W1
109 -58 1236 453326 5435648 414 3800

OSK-W-22-2540-W13
117 -60 1220 453466 5435639 410 3925

OSK-W-22-2646-W3
109 -58 1251 453326 5435648 414 3800

WST-21-0839
140 -38 577 453321 5435235 55 3600

WST-21-0974
142 -11 67 453441 5435223 -157 3700

WST-21-0979
178 -55 255 453358 5435296 -149 3675

WST-21-0980
131 -38 681 453374 5435297 -26 3675

WST-21-0997
119 -45 640 453506 5435326 -90 3800

WST-22-0999
134 -26 454 453445 5435276 -99 3725

WST-22-1000
139 -45 447 453360 5435297 -148 3675

WST-22-1004
137 -40 600 453322 5435236 54 3600

WST-22-1005
145 -44 334 453360 5435297 -148 3675

WST-22-1006
121 -45 616 453506 5435326 -90 3800

WST-22-1008
148 -42 420 453360 5435297 -148 3675

WST-22-1009A
120 -40 603 453507 5435332 -47 3800


Lynx Zone


Mineralization occurs as grey to translucent quartz-carbonate-pyrite-tourmaline veins and pyrite replacement zones and stockworks. Vein-type mineralization is associated with haloes of pervasive sericite-pyrite ± silica alteration and contain sulphides (predominantly pyrite with minor amounts of chalcopyrite, sphalerite, galena, arsenopyrite, and pyrrhotite) and local visible gold. Replacement mineralization is associated with strong pervasive silica-sericite-ankerite ± tourmaline alteration and contains disseminated pyrite from trace to 80% with local visible gold. Pyrite stockworks can form envelopes that reach several tens of metres in thickness. Fuchsite alteration is common and is spatially constrained to near the gabbros. Mineralization occurs at or near geological contacts between felsic porphyritic or fragmental intrusions and the host rhyolites or gabbros and locally can be hosted along the gabbro-rhyolite contact.


Qualified Person



The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Director of Exploration for Osisko’s Windfall gold project, who is a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).


Quality Control and Reporting Protocols



True


width


determination


is


estimated


at


55-80%


of


the


reported


core


length


interval


for


the


zone.


Assays


are


uncut


except


where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.5 g/t Au diluted over core lengths of at least 2.0 metres. NQ core assays were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at (i) ALS Laboratories in Val d’Or, Québec, Vancouver, British Colombia, Lima, Peru or Vientiane, Laos (ii) Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using a Four Acid Digestion-ICP-MS method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control (“QA/QC”) and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.


About the Windfall Gold Deposit



The Windfall gold deposit is located between Val-d’Or and Chibougamau in the Abitibi region of Québec, Canada. The Mineral Resource Estimate (





MRE





) defined by Osisko, as disclosed in the news release dated January 10, 2022 is


supported by the technical report entitled “Mineral Resource Estimate Update for the Windfall Project” dated February 10, 2022 (with an effective date  of October 21, 2021),


and assuming a cut-off grade of 3.50 g/t Au,


comprises 565,000 tonnes at 11.6 g/t Au (210,000 ounces) in the measured mineral resource category, 8,907,000 tonnes at 10.5 g/t Au (2,994,000 ounces) in the indicated mineral resource category and 13,035,000 tonnes at 8.6 g/t Au (3,585,000 ounces) in the inferred mineral resource category


. The key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in the January 10, 2022, news release, certain of which are described in the January 10, 2022, news release, are further described in the full technical report for this updated mineral resource estimate in accordance with NI 43-101 and is available on SEDAR (www.sedar.com) under the Corporation’s issuer profile. The Windfall gold deposit is currently one of the highest-grade resource-stage gold projects in Canada and has world-class scale. Mineralization occurs


in


three


principal


zones:


Lynx,


Main Zone,


and


Underdog.


Mineralization is generally


comprised of


sub-vertical


zones


following


intrusive porphyry


contacts


plunging


to


the


northeast.


The r


esources are defined from


surface


to


a


depth


of


1,600


metres as it now includes the Triple 8 (T8) zone. The resources excluding T8 are defined from surface to a depth of 1,200 metres.


T


he deposit


remains


open along


strike


and


at


depth


.


Mineralization


has


been


identified


at


surface


in


some


areas


and


as


deep


as


2,625


metres in others with significant potential to extend mineralization down-plunge and at


depth.


About Osisko Mining Inc.



Osisko is a mineral exploration company focused on the acquisition, exploration, and development of gold resource properties in Canada. Osisko holds a 100% interest in the high-grade Windfall gold deposit located between Val-d’Or and Chibougamau


in


Québec


and


holds


a


100%


undivided


interest


in


a


large


area


of


claims


in


the


surrounding


Urban


Barry


area and nearby Quévillon area (over 2,500 square


kilometres).


Cautionary Note Regarding Forward-Looking Information



This news release contains “forward-looking information” within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as “expects”, or “does not expect”, “is expected”, “interpreted”, “management’s view”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “potential”, “feasibility”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains the forward-looking information pertaining to, among other things: the Windfall gold deposit being one of the highest-grade resource-stage gold projects in Canada and having world-class scale; the key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in this news release; the prospects, if any, of the Windfall gold deposit; timing and ability of Osisko to file a technical report for the mineral resource estimate disclosed in this news release; the timing and ability of Osisko, if at all, to publish a feasibility study for the Windfall gold deposit; the amount and type of drilling to be completed and the timing to complete such drilling; the focus of the remaining infill drilling; the trend of grade increase; the Lynx zone remaining open to expansion down plunge; upgrading a inferred mineral resource to a measured mineral resource or indicated mineral resource category; future drilling at the Windfall gold deposit; the significance of historic exploration activities and results. Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management’s geological modelling; the ability of Osisko to complete further exploration activities, including (infill) drilling; property and royalty interests in the Windfall gold deposit; the ability of the Corporation to obtain required approvals; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.


CONTACT INFORMATION:


John Burzynski

Chief Executive Officer

Telephone (416) 363-8653


Primary Logo